izpis_h1_title_alt

Odpravljanje zapravljanj v proizvodnji štancanih delov
ID Mihelčič, Neža (Author), ID Kušar, Janez (Mentor) More about this mentor... This link opens in a new window, ID Berlec, Tomaž (Co-mentor)

.pdfPDF - Presentation file, Download (3,09 MB)
MD5: 5F322E63F118919DE939477F76746964

Abstract
Podjetje se že nekaj časa srečuje s slabimi rezultati na eni od proizvodnih linij štancanja. Odločili smo se, da bomo preučili trenutno stanje in na podlagi rezultatov analiz predlagali ukrepe, ki bodo pripomogli k odpravljanju zapravljanj, torej vseh dejavnosti, ki ne prispevajo k dodani vrednosti in povzročajo stroške. Sprotni preračuni skupne učinkovitosti opreme so nam omogočali vpogled v trenutno dogajanje in nadaljnjo primerjavo predvidenih rezultatov med seboj. Glede na šibke točke procesa smo po principih metode stalnih izboljšav kaizen oblikovali smiselne ukrepe za izboljšave. Predlagane ukrepe smo razvrstili v tri nivoje glede na višino potrebne investicije za njihovo uvedbo, jih opisali ter navedli pričakovan učinek na proces. Na podlagi rezultatov OEE in višine investicij smo ugotovili, da je najbolj smiselna vpeljava ukrepov brez vlaganj v kombinaciji z ukrepi, ki za izvedbo zahtevajo srednji rang investicije.

Language:Slovenian
Keywords:proizvodnja, procesi, učinkovitost, izboljšave, razpoložljivost, zapravljanja, štancanje
Work type:Master's thesis/paper
Typology:2.09 - Master's Thesis
Organization:FS - Faculty of Mechanical Engineering
Place of publishing:Ljubljana
Publisher:[N. Mihelčič]
Year:2019
Number of pages:XXII, 62 str.
PID:20.500.12556/RUL-112582 This link opens in a new window
UDC:658.5:005.935(043.2)
COBISS.SI-ID:16961051 This link opens in a new window
Publication date in RUL:25.10.2019
Views:1069
Downloads:253
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Eliminating wastes in the production of stamped parts
Abstract:
The company has been experiencing poor results on one of its stamping production lines. We have analysed the current situation with an aim to propose measures that will help eliminate wastage - activities that do not add value and cause costs. The ongoing calculations of the overall equipment effectiveness (OEE) provided us with an insight into the current developments and a further comparison of the projected results with each other. We have designed improvement measures considering the weaknesses of the process using the Kaizen - continous improvement approach. We divided the proposed measures into three levels according to the amount of investment required for their introduction, described them and stated their expected impact on the process. Based on the results of OEE and the amount of investments, we have found that the most sensible step is implementation of a combination of measures that don't require an investment with measures that require a medium level of investment.

Keywords:production, processes, effectiveness, improvements, availability, wastage, stamping

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back