izpis_h1_title_alt

Projektiranje odkopavanja premogovega sloja
Radovanovič, Alex (Author), Rošer, Janez (Mentor) More about this mentor... This link opens in a new window, Lajlar, Bojan (Co-mentor)

.pdfPDF - Presentation file, Download (4,06 MB)
MD5: 661556A1C5FD857CD95FDD08559B0912

Abstract
V diplomski nalogi je opisano projektiranje odkopavanja premogovega sloja v Premogovniku Velenje. Navedena in opisana so izhodišča, ki jih zahteva Zakon o rudarstvu (ZRud-1-UPB3), ki je pravna in strokovna podlaga za izdelavo rudarskega projekta. V omenjenem zakonu so med drugim navedeni tudi pogoji, ki jih morata izpolnjevati fizična in pravna oseba pri izdelavi projekta. Pri vsakem rudarskem projektu moramo slediti tudi zahtevam, ki jih določa interni pravilnik Premogovnika Velenje o načinu izdelave, zaporedju del, vsebini in reviziji rudarskega projekta. Skladno s tem pravilnikom se vsak rudarski projekt deli na tri dele, in sicer: splošni del, tehnični del in ekonomski del. V pravilniku je določena in precizirana vsebina rudarskega projekta in postopek revidiranja. Vsebina rudarskega projekta mora biti v skladu z zahtevani, ki ga določa Poslovnik o projektiranju in reviziji rudarskih projektov, pridobivanju dovoljenj ter spremni dokumentaciji. V diplomski nalogi sem obdelal tehnični del rudarskega projekta, ki zajema opis projektiranja pripravskih delovišč, tehnologije odkopavanja na odkopu, prezračevanje pripravskih delovišč in etaže, transport materiala in premoga, varnostne predpise, načrt obrambe in reševanja, geomehanski del in vplive na površje.

Language:Slovenian
Keywords:Zakon o rudarstvu, Premogovnik Velenje, rudarsko projektiranje
Work type:High school thesis (m6)
Tipology:2.11 - Undergraduate Thesis
Organization:NTF - Faculty of Natural Sciences and Engineering
Year:2019
COBISS.SI-ID:1844319 This link opens in a new window
Views:695
Downloads:254
Metadata:XML RDF-CHPDL DC-XML DC-RDF
 
Average score:(0 votes)
Your score:Voting is allowed only to logged in users.
:
Share:AddThis
AddThis uses cookies that require your consent. Edit consent...

Secondary language

Language:English
Title:Designing coal layer excavation
Abstract:
The diploma thesis describes the design of the coal seam excavation at the Velenje Coal Mine. The starting points required by the Mining Act (ZRud-1-UPB3), which is the legal and professional basis for the preparation of the mining project, are listed and described. The aforementioned Act also states, among other things, the conditions that must be met by a natural and legal person when designing a project. For each mining project, we also have to follow the requirements laid down in the internal rules of the Velenje Coal Mine regarding the method of production, sequence of works, content and audit of the mining project. In accordance with these rules, each mining project is divided into three parts, namely the general part, the technical part and the economic part. The policy sets out and specifies the content of the mining project and the audit process. The content of a mining project must be in accordance with the requirements laid down in the Rules of Procedure for the Design and Review of Mining Projects, Licensing and Supporting Documents. In my thesis I elaborated the technical part of the mining project, which includes the description of the design of the preparation sites, the technology of excavation at the excavation, ventilation of the preparation sites and floors, transportation of materials and coal, safety regulations, defense and rescue plan, geomechanical part and impacts on the surface.

Keywords:Mining act, Velenje Coal Mine, mine design

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Comments

Leave comment

You have to log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back