izpis_h1_title_alt

Analiza integracij 5D BIM: primer Osnovne šole Litija : magistrsko delo
ID Boncelj, Martin (Author), ID Cerovšek, Tomo (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (13,89 MB)
MD5: 3B3B56EC0B40D4BD4A3E445D0F8EE5BF

Abstract
V magistrskem delu so predstavljene ključne metode integracij, ki se uporabljajo za izmenjavo podatkov in informacij pri izdelavi modelov 5D BIM. Opisane integracije temeljijo na izmenjavi na osnovi odprtokodnih in zaprtih lastniških formatov, direktnih povezav API ter BIM strežnikov. Osrednja tematika magistrskega dela (integracije BIM) obravnava razčlenitev modeliranja, modelov in pristopa BIM ter prednosti in izzive tehnologije BIM. V praktičnem delu se obravnava v letu 2014 zgrajeni objekt Osnovne šole Litija, za katerega se je v obsegu magistrskega dela naredil tudi model 5D BIM. Za modeliranje in integracijo modela 5D BIM se je uporabilo ArchiCAD (3D BIM) in Navisworks Manage 2019 v povezavi z MS Project (4D in 5D BIM). Z opisanim modeliranjem in izmenjavami med omenjenimi programi je opisana ena izmed možnosti integracije 5D BIM ter predstavljene njene prednosti in izzivi. V nadaljevanju so podane še alternativne možnosti izbrani integraciji v praktičnem delu, kot so Bexel Manager, Synchro Pro, iTWO in Fuzor. Za primerjavo z izbrano integracijo praktičnega primera je predstavljen način njihovega delovanja in funkcije, ki jih te programske rešitve ponujajo.

Language:Slovenian
Keywords:BIM, integracija, odprtokodni format, IFC, zaprti format, povezava API, BIM strežnik, model 3D BIM, ArchiCAD, terminski plan, MS Project, model 4D BIM, model 5D BIM, Navisworks Manage, Bexel Manager, Synchro Pro, iTWO, Fuzor
Work type:Master's thesis/paper
Typology:2.09 - Master's Thesis
Organization:FGG - Faculty of Civil and Geodetic Engineering
Publisher:M. Boncelj]
Year:2019
PID:20.500.12556/RUL-109751 This link opens in a new window
UDC:004.946.5:373.3:727(497.4Litija)(043.3)
COBISS.SI-ID:8888161 This link opens in a new window
Publication date in RUL:08.09.2019
Views:2374
Downloads:480
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Analysis of 5D BIM integrations: case study of Litija Primary School : master thesis
Abstract:
The master's thesis presents key integration methods that are used today for the exchange of information in development of integrated 5D BIM models. The integrations described in the theoretical part include exchanges based on open source and closed proprietary formats, direct API connections, and BIM servers. The introduction to the main topic of the master's thesis (BIM integrations) consists of general divisions of BIM models and BIM modeling approach, as well as the advantages and challenges of BIM technology. In the scope of the practical part a 5D BIM model of Litija Primary School, which was built in 2014, was made. ArchiCAD was used as BIM authoring environment, Navisworks Manage and MS Project were used to create integrated BIM model. The description of modeling and the exchanges between programs used describe one of the 5D BIM integration options and outline its strengths and challenges. In the concluding part alternatives to selected practical integration are presented, e.g., Bexel Manager, Synchro Pro, iTWO and Fuzor. The comparison between the selected integration method in the practical use case and possible alternatives covers presentation of integration methods and specific software features.

Keywords:BIM, integration, open source format, IFC, closed format, API connection, BIM server, 3D BIM model, ArchiCAD, schedule, MS Project, 4D BIM model, 5D BIM model, Navisworks Manage, Bexel Manager, Synchro Pro, iTWO, Fuzor

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back