The diploma thesis describes the technological preparation of production for the hydrant cap. First is briefly explained the theoretical basis of technological preparation of production. Below are described technological process and current production costs. In central part is determination of the technological process for the new model and cost of production of the hydrant cap. The last section describes results obtained and the tips for improvements.
During the process of determining the technological process, focus was the most on determining the stages of work, selection of workplace, calculation of time norm, determination of the appropriate stock for a particular working place, and the calculation of production costs.
|