Zaradi zastojev pri operaciji montaže, prihaja do znižanja skupne učinkovitosti celotne avtomatizirane celice, katere del je obravnavana montažna priprava. Operacija vsebuje več kompleksnih postaj z veliko obrabljivimi deli, med njimi pa je tudi robotska manipulacija s kosi pri kateri pride do mehanskih poškodb na obdelanih mestih. Ker želimo odkriti vzroke za zastoje obstoječega procesa, smo izbrali metodo DMAIC, ki je del šest sigma metodologije. Ugotovimo, da sta glavna vzroka za zastoje nestandardizirani posegi v stroj ob okvari in s tem nepredvidene okvare pištole za kovičenje ter robotski naleti pri katerih pride do mehanskih poškodb, ki predstavljajo izmetne kose ter tako znižujejo faktor kakovosti. Najbolj zahteven in obremenjen del montažne priprave je pištola za kovičenje, ki je vzrok za 90 % zastojev na pripravi. Glavni izboljšavi v času diplomske naloge so izdelana navodila za montažo, demontažo, preventivni pregled in čiščenje pištole za kovičenje, ter zamenjano robotsko prijemalo, ki ne povzroča mehanskih poškodb na izdelkih.  

Language:Slovenian
Keywords:skupna učinkovitost, montažne priprave, sledljivost, mehanske poškodbe, standardizacija posegov
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FS - Faculty of Mechanical Engineering
Place of publishing:Ljubljana
Publisher:[M. Petrović]
Year:2019
Number of pages:XXI, 55 str.
PID:20.500.12556/RUL-108276 This link opens in a new window
UDC:658.515(043.2)
COBISS.SI-ID:16708635 This link opens in a new window
Publication date in RUL:23.06.2019
Views:899
Downloads:159
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Improvement of assembling machine's overall equipment effectiveness
Abstract:
Due to downtimes at the assembly operation it comes to the lowering of the overall equipment effectiveness by the complete automated robotic cell which is the part of the discussed assembling machine.The operation consists of more complex stations with many worn out parts, among them is also the robot manipulation with pieces where it comes to mechanical damage on the machined places. As we wanted to discover the reason for the downtimes by the existing process, we chose DMAIC which is a part of six sigma methodology. We established that the main reasons for the downtimes are nonstandardized interventions in the machine by its breakdown what results in the unexpected damage of the rivet gun and the robot collisions where it comes to mechanical damage followed by scrap-pieces that lower the quality. The most exacting and burdened part of the assembling machine is the rivet gun which is responsible for the 90 % of the machine downtimes. During the diploma work we made two main improvements: instructions for the assembly, dismantling, precautious check-up, rivet gun cleaning and the exchanged robot gripper that causes no mechanical damage of the products.

Keywords:overall equipment effectiveness, assembling machine, traceability, mechanical damages, standardization of interventions