izpis_h1_title_alt

Vpeljava metode hitre menjave orodij v steklarni
ID Oberč, Žiga (Author), ID Kramar, Davorin (Mentor) More about this mentor... This link opens in a new window, ID Berlec, Tomaž (Co-mentor)

.pdfPDF - Presentation file, Download (7,83 MB)
MD5: 048AC07C0E342E71E2194EB0E3F1A388

Abstract
Magistrska naloga je potekala v steklarni, kjer se ukvarjajo s proizvodnjo embalažnega stekla višjega kakovostnega razreda. Zaradi velikega povpraševanja trga po majhnih serijah izdelkov, prihaja do povečanega števila menjav orodij. V magistrski nalogi so se popisale teoretične osnove vitke proizvodnje in metode hitre menjave orodij. Izvedli so se vsi koraki metode hitre menjave orodij. V nalogi se je izboljšal sistem zapisovanja, računanja in merjenja časa trajanja menjave. Pri tem so se dobile realne vrednosti časov trajanja menjav in s tem povezan pravilen izračun faktorja skupne učinkovitosti opreme. S pomočjo metode hitre menjave orodij se je skrajšal čas menjave orodja. Pri tem se je uvedel nov sistem menjave s postopnim zagonom posameznih sekcij, ki nam omogoča, da v enakem časovnem obdobju v hladilno peč spravimo več dobrih kosov. Pripravila so se navodila za menjavo po novem postopku. S tem se je čas menjave bistveno skrajšal.

Language:Slovenian
Keywords:vitka proizvodnja metoda hitre menjave orodij (SMED) računaje časov trajanja menjave orodij ločevanje časov trajanja menjave orodij postopno zaganjanje stroja po sekcijah skrajšanje časa menjave orodij
Work type:Master's thesis/paper
Organization:FS - Faculty of Mechanical Engineering
Year:2018
PID:20.500.12556/RUL-105096 This link opens in a new window
Publication date in RUL:25.10.2018
Views:1463
Downloads:413
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Introduction the method Single Minute Exchange of Die in glass house
Abstract:
Master’s thesis is about work in the glass house, where production of a top quality special glass packaging is taking place. Due to increase in demand for smaller series of products, a higher change of tools is marked. The theoretical basis of lean production and the methods of Single Minute Exchange of Die (SMED) are described in the thesis. Furthermore, all the steps of SMED have been executed. Recording system, counting system and system of time measurement of changing tools are improved in the thesis. When working with the accessible data, the real-time value of changing tools duration and with this related accurate calculation of overall equipment efficiency factor were obtained. With the help of the SMED method, the time for changing tools has shortened. The new system for changing tools with gradual setup of individual sections is introduced in the thesis. This system enables to put more pieces of glass, which comply with customers’ requirements, in the cooling oven in the same time - frame. As a result of before mentioned, the new instructions for changing tools according to the new process were prepared, which resulted in significantly reduced machine setup time.

Keywords:lean manufacturing method Single Minute Exchange of Die (SMED) calculating times for changing tools separating times for changing tools gradually starting the machine in sections reducing machine setup time

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back