izpis_h1_title_alt

Analiza dokumentacije za pridobitev gradbenega in uporabnega dovoljenja za industrijsko - poslovni objekt
ID Šešok, Primož (Author), ID Šubic-Kovač, Maruška (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (4,49 MB)
MD5: 42716686C911AECB2CCEEAE3C462CA1B
PID: 20.500.12556/rul/ee7027e1-b5b9-4ce5-9ab2-86e3a06413b1

Abstract
V nalogi na konkretnem primeru odstranitve proizvodnega objekta in nove gradnje proizvodno-poslovnega objekta investitorja Kovit projekti d.o.o., Trbovlje, predstavljam potek procesa pridobivanja ustreznih dovoljenj za gradnjo in uporabo objekta ter izdelavo potrebne dokumentacije kot osnovo za njuno pridobivanje. V uvodu opozorim na težave, s katerimi se večkrat srečuje investitor pri zagotavljanju sredstev za realizacijo načrtovane gradnje, in prikažem vlogo države pri pomoči za realizacijo investicij, ki vplivajo na višjo rast bruto domačega proizvoda, zmanjšujejo nezaposlenost in s tem zagotavljajo višjo kakovost življenja. V nadaljevanju povzemam iz ZGO-1 (UL RS št. 102/04 s spremembami in dopolnitvami) in Pravilnika o projektni dokumentaciji (UL RS št. 55/2008) določila, ki se nanašajo na gradnjo industrijsko-proizvodnega in poslovnega objekta. Opisan je postopek pridobivanja gradbenega dovoljenja in predstavljeni sestavni deli potrebne projektne dokumentacije. Obrazloženo je, kako je dokumentacija usklajena z določili občinskega prostorskega izvedbenega akta, ki velja za obravnavano območje urejanja, kar je osnova za načrtovanje investicije na zemljišču predvidene gradnje. Opisan je postopek pridobivanja uporabnega dovoljenja in navedena potrebna projektna dokumentacija ter njena vsebina. Prikazane so spremembe, nastale med gradnjo, postopek tehničnega pregleda in namen pridobljenega uporabnega dovoljenja. V zaključnih ugotovitvah skušam navesti nekaj težav, s katerimi se pri pridobivanju dovoljenj srečujeta investitor in projektant. Prikažem svoje slabe in dobre izkušnje pri tem ter navedem nekatere izboljšave, za katere menim, da bi jih bilo potrebno upoštevati za zboljšanje obstoječega sistema pridobivanja ustreznih dovoljenj.

Language:Slovenian
Keywords:gradbeno dovoljenje, uporabno dovoljenje, projektna dokumentacija, ZGO-1, pravilnik
Work type:Undergraduate thesis
Typology:2.11 - Undergraduate Thesis
Organization:FGG - Faculty of Civil and Geodetic Engineering
Place of publishing:Ljubljana
Publisher:[P. Šešok]
Year:2016
PID:20.500.12556/RUL-84331 This link opens in a new window
UDC:351.778.511(497.4)(043.2)
COBISS.SI-ID:7565153 This link opens in a new window
Publication date in RUL:19.08.2016
Views:2656
Downloads:505
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:The analysis of documentation for acquiring the building and usage permit for an industrially commercial building
Abstract:
In my thesis I have presented the process of acquiring the necessary building and usage permit for the building as well as the making of the required documentation which is necessary in the process of acquiring for the building and usage permit. My research is based on a concrete example: removing of the manufacturing building and building of a new construction of a manufacturing commercial building by the Kovit projekti d. o. o., Trbovlje (Kovit projects Ltd., Trbovlje) investors. In the introductory part of my thesis I have pointed out the problems which are often encountered by the investors when insuring the funds for the realization of the planned building. I have also presented the role of the state in helping realizing the investments which have a great influence on the higher gross domestic product growth as well as reduce unemployment and by that ensure a higher quality of life. In the main part of my thesis I have summed up the provisions which refer to the building of an industrial manufacturing and business building from the ZGO-1 law and regulations. I have described the process of acquiring the building permit and have presented the component parts of the necessary project documentation and have listed in which way the documentation is coordinated with the municipal spatial executive instrument which is valid for the treated area of arranging, which is furthermore the base for the investment planning on the land of the anticipated building. Moreover, I have described the process of acquiring the usage permit and all the necessary documentation and its content. I have also pointed out the changes which have occurred during the process of building, the process of technical examination and the purpose of the acquired building permit. In my final findings I have tried to present a few problems which the investor as well as the design engineer run into while acquiring all the necessary permits. I have listed the bad as well as the good experiences while working on my research project and have furthermore pointed out a few improvements which I believe would be good to acknowledge in order to improve the existing system of acquiring the appropriate permits.

Keywords:building permit, usage permit, project documentation, ZGO-1, regulations

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back