Optimizacija projekta na osnovi informacijskega modela stavbe 5D : diplomska naloga
ID Zabret, Rok (Author), ID Cerovšek, Tomo (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (5,45 MB)
MD5: 38B89F385925505DF496455C8281250F
PID: 20.500.12556/rul/23ae4d1d-bb21-4f55-940c-58b951a82a19

Abstract
V tujini vse več investitorjev zahteva uporabo BIM tehnologije pri izvedbi projektov. Kriza v gospodarstvu je tudi gradbeništvo prisililo k natančnejšim pristopom zasnove in izvedbe projekta, kjer imajo ključno vlogo zagotavljanje potreb uporabnikov, kakovost, stroški in trajanje izvedbe. V diplomskem delu sem kot primer rabe BIM tehnologije izdelal informacijski model enodružinske hiše. Gre za enostavno tri-etažno hišo s skupno neto površina 352 m2, od katerih je približno 100 m2 neizkoriščenega podstrešja. S pomočjo orodij BIM, sem izdelal 3D model zgradbe ter ga nadgradil z dodatnima dimenzijama časa (4D) in stroškovne ocene (5D). Parametrični model zgradbe sem izdelal v programu ArchiCAD, s katerim sem izdelal osnovni popis količin materiala ter vizualizacijo. S pomočjo izdelanega modela v ArchiCAD-u sem nato izdelal še terminski plan (4D) ter opravil modelno-lokacijsko optimizacijo projekta in stroškovno oceno (5D) v programu Vico Control. Pri izdelavi terminskega plana sem zgradbo razdelil na cone izvedbe in s prerazporejanjem dejavnosti in delovne sile optimiziral terminski plan. Terminski plan sem uporabil tudi za izdelavo simulacije virtualnega poteka gradnje s pomočjo dodatka »Construction Simulation«. S pomočjo programa CostX sem na koncu prikazal še nekatere dodatne izmere in tudi njim dodal stroškovno oceno.

Language:Slovenian
Keywords:gradbeništvo, diplomska naloga, VSŠ-B, BIM, archiCAD, vico control, parametrični model 5D
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FGG - Faculty of Civil and Geodetic Engineering
Place of publishing:Ljubljana
Publisher:[R. Zabret]
Year:2014
Number of pages:X, 46 str., [4] . pril.
PID:20.500.12556/RUL-32377 This link opens in a new window
UDC:004.6:624:69(043.2)
COBISS.SI-ID:6771041 This link opens in a new window
Publication date in RUL:10.07.2015
Views:3343
Downloads:495
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Project optimization based on 5D BIM
Abstract:
Clients are incresingly demanding the use of BIM tehnology, which is becoming essential for successful complition of building project. The economical crises forced the Construction industry to a more precise design and construction methods in terms of end-user needs, quality, costs and duration. In the thesis, I demonstrate building project optimization for one-family house. Building has three stories, totaling to a 352m2, out of which approximately 100m2 are in the top floor. Using BIM tools I created a 3D building model, and upgraded it with additional dimension of time (4D) and cost estimation (5D). Parametric model of the building was created in ArchiCAD in which I also made a list of quantities of materials and visualization. Project scheduling and cost estimation was done in Vico Control. For the purposes of optimization of the project schedule, I divided the building into inividual zone that were used for flow-chart and related redeployment of tasks and labor activity. The virtual construction simulation was also created with »Construction Simulation«.

Keywords:graduation thesis, civil engineering, BIM, ArchiCAD, vico control, parametric models 5D