izpis_h1_title_alt

Normativi za kanalizacijska dela : diplomska naloga
ID Jerala, Jaka (Author), ID Šelih, Jana (Mentor) More about this mentor... This link opens in a new window, ID Rus, Ivan (Comentor), ID Srdič, Aleksander (Comentor)

.pdfPDF - Presentation file, Download (6,82 MB)
MD5: 2BA367DDC5E98E3B40A82ACFC826685C
PID: 20.500.12556/rul/e383b9f4-0122-4572-8e69-2275cbf77a67

Abstract
Diplomska naloga zajema analize delovnih postopkov, ki se uporabljajo pri kanalizacijskih delih, konkretno za fekalno in meteorno kanalizacijo. V prvem delu smo raziskali materiale, ki se uporabljajo pri gradnji kanalizacijskih sistemov, načine skladiščenja ter vgrajevanja in še nekaj splošnih dejstev, ki jih je potrebno poznati pri gradnji kanalizacijskih sistemov. V drugem delu smo v projektnem informacijskem sistemu XPERT določili normative za delovne postopke, ki se uporabljajo pri kanalizacijskih delih. Ugotovili smo kateri so bistveni parametri, ki vplivajo na normativno porabo virov pri izbranih delovnih postopkih in na podlagi različnih virov določili njihove vrednosti. V odvisnosti od spremenljivih parametrov smo določili formule, ki določajo normativno porabo virov v delovnih postopkih. Za izbrane delovne postopke smo pripravili kalkulativne predloge, ki so v pomoč uporabniku pri kalkulaciji. V predlogah smo uporabili vire iz baze podatkov XBASE.

Language:Slovenian
Keywords:delovni postopek, normativ, kalkulativna predloga, vir, kanalizacija, XPERT, XBASE
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FGG - Faculty of Civil and Geodetic Engineering
Publisher:[J. Jerala]
Year:2017
PID:20.500.12556/RUL-96486 This link opens in a new window
UDC:006:628.2(043.2)
COBISS.SI-ID:8173665 This link opens in a new window
Publication date in RUL:02.10.2017
Views:3594
Downloads:679
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Norms for sewage projects : Graduation thesis
Abstract:
The paper covers analysis of work procedures, used in sewage projects, specifically in fecal and rainfall sewage. The first part of the paper includes research of materials used in building sewage systems, the ways of storage and installing, and other general facts that are required in building sewage systems. In the second part work procedural norms in sewage projects were determined, using the project information system XPERT. This led to the necessary parameters that influence the norm of resource use in the chosen work procedures. The parameters were determined using various sources. With the dependency on variable parameters in mind, formulas were determined that provide the norm of resource use in work procedures. For the chosen procedures, calculative templates were prepared that are of help to the user. The templates use sources from the XBASE database.

Keywords:work procedure, norm, calculative template, source, sewage, XPERT, XBASE

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back