For the purposes of determining the geoid and the connection of the height and chart datum, we connected tide staff along Slovene coast on levelling network of Slovenia. On the basis of the measurements with the geometric levelling method and processing of the measured values, we determined heights in height datums of Trieste and Koper, and analyzed the accuracy of the measured height differences and the accuracy of the determination of the height.
|