Geodetska dela pri gradnji vodovoda naselja Orle : Diplomska naloga
ID Marovt, Tim (Author), ID Ambrožič, Tomaž (Mentor) More about this mentor... This link opens in a new window, ID Koler, Božo (Co-mentor)

.pdfPDF - Presentation file, Download (4,43 MB)
MD5: 8636DFB44C921FEF1600E6F79BE565FA
PID: 20.500.12556/rul/5a9b622c-81e3-44c2-a653-08b32622058d

Abstract
V diplomski nalogi smo predstavili projekt navezave naselja Orle na mestni vodovod Ljubljana. Najprej smo si ogledali teren, kjer naj bi vodovod potekal, nato pa smo tu vzpostavili izmeritveno mrežo, ki smo jo izmerili in tudi izravnali. Opisali smo obdelavo podatkov in oceno natančnosti izmere, s katero smo zelo zadovoljni, saj poligon poteka po gozdnatem območju. Na podlagi točk izmeritvene mreže smo najprej zakoličili objekt po projektu, nato smo izmerili vodovod pred samim zasutjem, da smo na koncu lahko naredili geodetski načrt. Merili smo tako položaj, kot tudi višino vodovoda. Poleg primarnega vodovoda smo merili tudi priključke nanj. Na koncu smo izdelali še elaborat celotnega projekta, ki je moral vsebovati vse ustrezne dokumente, da so potem lahko naselje Orle priključili na mestni vodovod Ljubljana.

Language:Slovenian
Keywords:Vodovod Ljubljana, Orle, geodetski načrt, izmeritvena mreža, geodetska dela, koordinate in njihova natančnost, izravnava
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FGG - Faculty of Civil and Geodetic Engineering
Publisher:[T. Marovt]
Year:2017
PID:20.500.12556/RUL-94457 This link opens in a new window
UDC:528.4:628.1(497.4Orle)(043.2)
COBISS.SI-ID:8125537 This link opens in a new window
Publication date in RUL:29.08.2017
Views:1731
Downloads:761
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Surveyors works in the construction of the water supply system of the Orle : Graduation thesis
Abstract:
The thesis presents the project of connecting the Orle settlement to Ljubljana’s water supply system. Firstly, the terrain of the planned water supply system was researched and, secondly, the measurement network of the area was established, which was measured and also adjusted. The calculations and the accuracy of measurement were described, which are very promising, since the water supply system runs on woodland area. Based on the coordinates of the measurement network, the setting out of the installation was conducted according to the project plan, followed by the measurement of the water pipeline before its backfilling. The position and the height of the water pipeline was measured. The measurements included the position of the main pipeline and its connections. Finally, the feasibility study of the whole project was prepared, which had to contain all the relevant documents in order to enable the Orle settlement’s connection to Ljubljana’s city water supply system.

Keywords:Ljubljana Water Supply System, Orle, land surveying plan, measurement network, land surveying works, coordinates and their accuracy, adjustment