Details

Določitev raztrosa kritičnih napetosti za dinamično rekristalizacijo za jeklo AlSI M2 : diplomsko delo
ID Gostinčar, Tadej (Author), ID Kugler, Goran (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (6,46 MB)
MD5: DBF2F2DDEF0BE3FCB09F58027D9532A2
PID: 20.500.12556/rul/dede498c-6b0f-4714-9e19-ad31737f6306

Language:Slovenian
Keywords:krivulje tečenja, vroče preoblikovanje, dinamična rekristalizacija, kritična napetost, hitrorezno jeklo BRM2
Work type:High school thesis
Typology:2.11 - Undergraduate Thesis
Organization:NTF - Faculty of Natural Sciences and Engineering
Place of publishing:Ljubljana
Publisher:[T. Gostinčar]
Year:2016
Number of pages:42 str., 2 pril.
PID:20.500.12556/RUL-89038 This link opens in a new window
UDC:669.1
COBISS.SI-ID:1646175 This link opens in a new window
Publication date in RUL:10.02.2017
Views:3173
Downloads:482
Metadata:XML DC-XML DC-RDF
:
GOSTINČAR, Tadej, 2016, Določitev raztrosa kritičnih napetosti za dinamično rekristalizacijo za jeklo AlSI M2 : diplomsko delo [online]. Bachelor’s thesis. Ljubljana : T. Gostinčar. [Accessed 12 April 2025]. Retrieved from: https://repozitorij.uni-lj.si/IzpisGradiva.php?lang=eng&id=89038
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Keywords:flow curves, hot working, dynamic recrystallization, crystal flow stress, high speed steel AlSI M2

Similar documents

Similar works from RUL:
  1. A systemic framework for addressing cybersecurity in construction
  2. Cybersecurity assessment of BIM/CDE design environment using cyber assessment framework
  3. Bi-directional Interoperability Between Architectural and Structural BIM for Efficient Structural Design and Analysis
  4. ǂAn ǂanalysis of the use of building information modeling in Slovenia
  5. Use of Building Information Modelling (BIM) in design of electrical installations on vessels
Similar works from other Slovenian collections:
  1. Building information modeling (BIM):meaning and examples
  2. Culture change in construction industry: from 2D toward BIM based construction
  3. Usage, potentials and challenges of building information modelling (BIM) in Slovenia, Austria, Germany and Switzerland
  4. Implementation of BIM workflow and BIM coordination in a construction company
  5. Simulation of wind driven rain effect on aesthetical performance of wooden facad

Back