izpis_h1_title_alt

Uvedba novega sistema za spremljanje proizvodnje v Pohištvu Brežice d.d. : diplomsko delo (visokošolski strokovni študij)
ID Banič, Aleksander (Author), ID Oblak, Leon (Mentor) More about this mentor... This link opens in a new window, ID Kropivšek, Jože (Reviewer)

.pdfPDF - Presentation file, Download (1,39 MB)
MD5: 00EE3D93397CE2DCFF03863E15167066
PID: 20.500.12556/rul/c5e0a0a0-68cc-4866-a813-04444a5257c4

Abstract
V tovarni Pohištvo Brežice d.d., skupina Novoles smo analizirali čas, potreben za spremljanje proizvodnje po dosedanjem sistemu za spremljanje in ga primerjali s tistim, ki ga prihranimo z uvedbo novega sistema. Analizirali smo razvrščanje delovnih nalogov, terminiranje in planiranje ter teoretično opisali probleme pri razvrščanju. Opisali in analizirali smo obstoječi sistem spremljanja proizvodnje in naredili osnutek novega sistema; ta je zelo enostaven pri vnosu podatkov, pri kontroli povratnih informacij pa podatkovno preglednejši. Naredili smo tudi osnutek za podrobno planiranje na ključnih delovnih mestih, za premeščanje posameznih operacij in spremljavo le-teh po zaključnem delu.

Language:Slovenian
Keywords:organizacija, študij dela, planiranje, spremljanje proizvodnje, analiza stanja
Work type:Undergraduate thesis
Typology:2.11 - Undergraduate Thesis
Organization:BF - Biotechnical Faculty
Place of publishing:Ljubljana
Publisher:[A. Banič]
Year:2005
Number of pages:VIII, 51 f.
PID:20.500.12556/RUL-89 This link opens in a new window
UDC:65.012.3
COBISS.SI-ID:1330313 This link opens in a new window
Publication date in RUL:11.07.2014
Views:2475
Downloads:514
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Introduction of a new production monitoring system in the Pohištvo Brežice d.d. : graduation thesis (higher professional studies)
Abstract:
In Pohištvo Brežice d.d. factory, a member of the Novoles group, the time lost due to monitoring of production under the existing system of production monitoring was analysed and compared to the time potentially saved by a new system introduction. The work order distribution, scheduling and planning were studied and a theoretical description of problems faced in distribution of work orderes prepared. The existing system of production monitoring was described and analysed, and a proposal for a new one prepared. If introduced, the proposed new system will be quite uncomplicated in respect to the data entry, and will provide much better data transparency in the feedback information control. A proposal for a detailed planning of key work-posts, relocation of individual operations, and monitoring of the same after the finished work were also prepared.

Keywords:organisation, work study, planning, production monitoring, analysis

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back