The thesis describes the geodetic works on the construction of overpass Lipovci. It describes geodetic work before construction, during construction and after the construction. The establishment of surveying network is explained and making of the geodetic plan. It also contains a full description of the stakeout procedures and methods. Specify the accuracy of stakeout method. This is followed by stakeout procedures on overpass and used instrumentation. It is described concrete example of stakeout on deck construction. The analysis accuracy of stakeout it´s described at the end.
|