izpis_h1_title_alt

Prestavitev svetlobnih stolpov v okviru izgradnje terminalskih skladišč v luki
ID ERŽEN, GAŠPER (Author), ID Mušič, Gašper (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (7,44 MB)
MD5: B0AE13C97153B4EBD0E8CED98EAF1AC6
PID: 20.500.12556/rul/7fbda5aa-9a78-41aa-9b2d-55d7fb62c287

Abstract
V okviru diplomskega dela sem v začetnih poglavjih predstavil terminal Sipki tovori, na katerem sem bil zaposlen daljši čas. Predstavljena so dvigala, ki služijo za pretovarjanje tovora, ki se skladišči na odprtih in zaprtih skladiščnih površinah. V nadaljevanju sem predstavil sodelovanje pri prenovi projektov izgradnje novih terminalskih hal za skladiščenje žitaric na drugem pomolu v Luki Koper. Omenjeni projekt je bil zasnovan na podlagi izkušenj in spoznanj gradnje starih terminalskih skladišč in avtomatsko vodenega sistema transportnih poti, ki potekajo od obale do skladišč. Na novi lokaciji skladišč je tudi nekaj objektov kot so transformatorska postaja, stolpi za razsvetljavo, ki jih bo potrebno premestiti oziroma zgraditi nove. V jedru diplomskega dela sem opisal selitev dveh svetlobnih stolpov za razsvetljavo na novo lokacijo. Opisani so postopki predelave starega krmilja z lokalnim vklopom na nov daljinski vklop. Predelava krmilja bo izvedena z vgradnjo krmilnika Cybro 2-24E podjetja Robotina. Krmilnik bo omogočal tudi povezavo na interni scada sistem daljinskega nadzora nad razsvetljavo v pristanišču. S tem bo omogočen vklop in izklop razsvetljave s poljubnega in vnaprej določenega oddaljenega delovnega mesta. V diplomskem delu je prikazana možnost uporabe starejše opreme (svetlobni stolpi, svetila z visokotlačno natrijevo sijalko), ki je z določeno izboljšavo krmiljenja še vedno uporabna za razsvetljavo skladiščnih površin. Uporaba omenjene opreme se nam zdi smiselna tudi z vidika dobave rezervnih delov.

Language:Slovenian
Keywords:Luka Koper, dvigala, terminalska skladišča, svetlobni stolpi, krmilnik Cybro 2-24E Robotina
Work type:Undergraduate thesis
Organization:FE - Faculty of Electrical Engineering
Year:2016
PID:20.500.12556/RUL-83591 This link opens in a new window
Publication date in RUL:20.06.2016
Views:1032
Downloads:573
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Relocation of light towers within the terminal warehouse building project in the seaport
Abstract:
In the first part of the diploma thesis, the Bulk cargo terminal in Port of Koper, where I used to work, is described. The cranes, which serve for transhipment of the cargo, stored in the open and closed warehouses are described detailed. In the second part, my cooperation in renovation of the projects, for the construction of the new terminal warehouses for the storage of cereals on the second pier in the Port of Koper is presented. The project was designed, based on the experiences and knowledge with the existing terminal warehouses and automated transport systems between the coast and the warehouses. At the location of the new warehouses are also transformer station and lighting towers, which must be relocated or build new ones. Further, the relocation of the two lighting towers is described. The old lights were controlled localy, the new lights will be controlled remotely. The remote control will be introduced with installation of Robotina Cybro 2-24E controllers with communication capabilities. The lights will be integrated into existing SCADA system (Supervisory Control And Data Acquisition is a system for remote monitoring and control that operates with coded signals over communication channels). The operator will be able to switch on and off the lights from a remote control center. The use of older equipment, like lighting towers, floodlights with high pressure sodium lamps is also described in the diploma thesis. With some improvement of the control system, this equipment is still useful for lighting warehouse areas. The use of this equipment is also reasonable from the point of spare parts availability.

Keywords:Port of Koper, cranes, terminal warehouses, lightning towers, controller Cybro 2-24E Robotina

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back