izpis_h1_title_alt

Izdelava strokovnih podlag za študijo izvedljivosti investicijskega projekta mHE Osolin : magistrsko delo
ID Andrejka, Nejc (Author), ID Kryžanowski, Andrej (Mentor) More about this mentor... This link opens in a new window, ID Srdič, Aleksander (Comentor)

.pdfPDF - Presentation file, Download (5,01 MB)
MD5: 652B5A672252F026693F3727D21146AC
PID: 20.500.12556/rul/de6216e6-cbf3-4b30-af68-f4d94e1c55d3
.zipZIP - Appendix, Download (157,20 KB)
MD5: 42EA109C536D854C859633C257007E0B
PID: 20.500.12556/rul/645c80ce-8328-4c28-9733-f4b1485a259a

Abstract
V zadnjih dveh desetletjih se je v Sloveniji pognale številne male hidroelektrarne. Nekatere med njimi so novogradnje, druge so renovirane, pogosto ostanek zapuščenega ali propadlega industrijskega obrata. Do nedavnega veljavna t.i. podporna shema, je omogočala tudi tistim manj upravičenim hidroelektrarnam, da so postale investicijsko upravičene. Z letom 2015 se ta podporna shema zapira in v veljavo stopa nov način subvencioniranja po sistemu dražbe za tekoče leto. Takšen način subvencioniranja in mnoge nejasnosti v hidroloških pogojih napravijo mikro hidroelektrarno tipa Osolin dokaj tvegano investicijo. Da se izognemo potencialno slabim rešitvam, se izdela predinvesticijska študija, kjer podamo različne rešitve in presodimo njihovo upravičenost. V koliko je investicija smiselna, na koncu študije predlagamo še rešitev.

Language:Slovenian
Keywords:gradbeništvo, magistrska dela, mala hidroelektrarna, proizvedena energija, moč, vodno dovoljenje, ocena izvedljivosti, ocena učinkovitosti vlaganja, tveganje
Work type:Master's thesis/paper
Typology:2.09 - Master's Thesis
Organization:FGG - Faculty of Civil and Geodetic Engineering
Place of publishing:Ljubljana
Publisher:[N. Andrejka]
Year:2015
Number of pages:XII, 90 str., 5 pril.
PID:20.500.12556/RUL-80034 This link opens in a new window
COBISS.SI-ID:7322977 This link opens in a new window
Publication date in RUL:05.01.2016
Views:3515
Downloads:765
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Expert basis for feasibility study of a small Hydro power plant Osolin
Abstract:
Slovenia has for the last two decades a positive trend in constructing and renovating of small hydro power plants. Renovated ones are often those left behind by industries that shot down lately. Governmental implementation of support scheme was a reason that many of them had been eligible for the last years, even those with poor optimization and efficiency. This scheme stopped in 2015 and was substituted with a new one based on an auction. A new method of support brings large uncertainty between design engineers. Multiplying this with uncertainties of hydrological conditions makes investment in a small hydro power plant like Osolin a risky investment. To avoid potentially poor solutions, there is a necessity of making pre-investment studies. In pre-investment studies we introduce and check different solutions. If the solutions meet obligated requirements, the last step is to propose the best one.

Keywords:civil engineering, master of science thesis, small hydropower plant, electricity, power, water permit, feasibility study, effectiveness of investment, risk

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back