Umeščanje hidroenergetskega objekta v prostor
ID Kristan, Urban (Author), ID Steinman, Franc (Mentor) More about this mentor... This link opens in a new window, ID Rak, Gašper (Co-mentor)

.pdfPDF - Presentation file, Download (17,04 MB)
MD5: 92D0FC54B401AB10D66C5D9281D4A88D
PID: 20.500.12556/rul/be9a0b1a-261b-4521-ae8d-abfdb44723e3

Abstract
Pri umeščanju malih hidroelektrarn (v nadaljevanju mHE) v prostor se srečujemo na eni strani z zakonodajo, ki spodbuja gradnjo objektov, katerih namen je proizvodnja električne energije iz obnovljivih virov in na drugi strani z zakonodajo o ohranjanju vodnih virov, ki gradnjo zavira. Diplomsko delo obravnava ustreznost lokacije, že obstoječe male hidroelektrarne, kjer preverja najpomembnejša parametra, ki vplivata na proizvodnjo in z njo povezan dobiček. To sta režim in izdatnost vodotoka skozi celo leto ter bruto višinska razlika zgornje vode za jezom in spodnje vode v sesalni komori. Ob tem upošteva trenutno zakonodajo, prostorske omejitve in okoljski vidik. Ker na obravnavanem vodotoku ni objekta, ki bi omogočal neprekinjene meritve nivoja vode, je krivulja trajanja pretokov izdelana na podlagi dnevnih podatkov obratovanja mHE in znanih ostalih parametrov v enačbi za izračun moči. Visoke vode so bile določene preko meritev in opazovanj skozi leto s pomočjo izdelane pretočne krivulje. S programsko opremo HEC-RAS in z vnesenim modelom struge ter modelom, ki posnema sistem MHE, je ob različnih pretokih bil preverjen vpliv nihanja zgornje in spodnje vode na bruto padec. Ob danih pogojih višinske razlike in pretoka je bila izbrana vrsta in velikost požiralnosti turbine po sistemu maksimalno izkoriščenih danosti in minimalnih izgub.

Language:Unknown
Keywords:mala hidroelektrarna, prostorsko umeščanje, hidroenergetski potencial, turbina
Work type:Bachelor thesis/paper
Organization:FGG - Faculty of Civil and Geodetic Engineering
Year:2014
PID:20.500.12556/RUL-72647 This link opens in a new window
COBISS.SI-ID:6887009 This link opens in a new window
Publication date in RUL:29.09.2015
Views:2396
Downloads:526
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:Unknown
Title:Small Hydropower Plant spatial alocation
Abstract:
When locating the small hydropower plants into a certain area, we are facing the legislation that on one hand promotes the construction of facilities, whose purpose is the generation of electricity from renewable sources and on the other hand the legislation on the protection of water resources, habitats etc., which inhibits the building. The thesis deals with the appropriateness of the location of already existing small hydro power plant, which verifies the most important parameters influencing the production and the related profit. These are the run-off regime and the rate of flow of the stream throughout the year and the gross height difference between level of upstream water behind the dam and level of downstream water in the suction chamber. All this is covered by the current legislation, the spatial limits and environmental aspects. There aren't any facilities on the stream that would allow continuous measurements of water level; therefore the flow duration curve is constructed on the basis of daily data operating small hydropower plant. High waters were determined through measurements and observations throughout the year by using the designed stage-discharge curve. By entering the channel model and a model that simulates a system of small hydropower plant in the software HEC-RAS, was tested the impact of fluctuations in upper and lower waters of the gross height difference at different flow rates. At the given conditions of altitude and discharges the type and size of the turbine system was selected for maximum utilization of resources and minimal losses on the system.

Keywords:small hydropower plant, spatial allocation, hydro-energetic potential, turbine