Details

Analiza mehanskih lastnosti magnetnih kompozitov Sm-Fe-N s PA12 : diplomsko delo
ID Kosmač, Karla (Author), ID Bizjak, Milan (Mentor) More about this mentor... This link opens in a new window, ID Saje, Boris (Comentor)

.pdfPDF - Presentation file, Download (2,95 MB)
MD5: EA616CD53D7DA6F3A87592FBFBCF4BAA
PID: 20.500.12556/rul/0fd20822-a9ba-46fc-8b8e-e5fb97be9196

Language:Slovenian
Keywords:trajni magneti, plastomagneti, SmFeN, PA12, ekstruzija, injekcijsko brizganje, testiranje plastomagnetov
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:NTF - Faculty of Natural Sciences and Engineering
Place of publishing:Ljubljana
Publisher:[K. Kosmač]
Year:2015
Number of pages:VII, 47 f.
PID:20.500.12556/RUL-71994 This link opens in a new window
UDC:537
COBISS.SI-ID:1545055 This link opens in a new window
Publication date in RUL:13.08.2015
Views:4818
Downloads:1230
Metadata:XML DC-XML DC-RDF
:
KOSMAČ, Karla, 2015, Analiza mehanskih lastnosti magnetnih kompozitov Sm-Fe-N s PA12 : diplomsko delo [online]. Bachelor’s thesis. Ljubljana : K. Kosmač. [Accessed 9 April 2025]. Retrieved from: https://repozitorij.uni-lj.si/IzpisGradiva.php?lang=eng&id=71994
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Keywords:permanent magnets, bonded magnets, SmFeN, PA12, extrusion, injection molding, testing bonded magnets

Similar documents

Similar works from RUL:
  1. Production line cleaning simulation in virtual reality
  2. Automation of a production line in a pharmaceutical company
  3. Production line operation monitoring with edge processing and visualization in the cloud
  4. The transformation of production line to U-cell
  5. Dejavniki izbire proizvodne lokacije v industriji avtomobilskih dobaviteljev na primeru Cimos d.d.
Similar works from other Slovenian collections:
  1. Production optimization on pallet system CNC machines MAKINO A55
  2. Model preventive maintenance production line IS-3
  3. Visualization of a production line with Siemens TIA
  4. Planning and installing a new production line in the company MIK Celje d.o.o.
  5. RENOVATION OF THE NAPKINS PRODUCTION PROCESS IN THE PALOMA D.D.

Back