Ponovna obdelava meritev v nivelmanski mreži HE Moste od 1958 do 1986 : diplomska naloga
ID Hočevar, Boštjan (Author), ID Ambrožič, Tomaž (Mentor) More about this mentor... This link opens in a new window, ID Kogoj, Dušan (Co-mentor)

.pdfPDF - Presentation file, Download (4,83 MB)
MD5: 2F2A1A8A6A2F529E98E565784E2A5D53
PID: 20.500.12556/rul/e0e7519c-dedb-4a5e-a644-020513d78ce7

Abstract
V diplomski nalogi smo predstavili mikronivelmansko geodetsko mrežo Hidroelektrarne Moste, razvito okoli pregrade hidroelektrarne, ki leži v soteski Kavčke pod Žirovnico. Uporabili smo rezultate meritev geodetske mreže med letoma 1958 in 1986. Podrobno smo predstavili spreminjanje dveh geometrij mrež in uporabljeni instrumentarij. Vse pridobljene podatke meritev smo ponovno obdelali, opazovanja izravnali, rezultate relativnih in kumulativnih premikov pa smo smiselno prikazali v tabelarični in grafični obliki. Pri izravnavi smo skozi celotno obdobje uspeli zagotoviti enoten geodetski datum. To nam je omogočilo, da smo dobili kontinuiran vpogled v dogajanje mreže v 28-letnem obdobju. Ugotovitve so pokazale, da do večjih premikov reperjev v veliki večini ni prišlo.

Language:Slovenian
Keywords:geodezija, diplomska dela, VSŠ, TUN, nivelmanska mreža, geodetski datum, posredna izravnava, reper, premiki
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FGG - Faculty of Civil and Geodetic Engineering
Place of publishing:Ljubljana
Publisher:[B. Hočevar]
Year:2012
Number of pages:XVIII, 80 str., 7 pril.
PID:20.500.12556/RUL-32580 This link opens in a new window
UDC:528.33:627.8(043.2)
COBISS.SI-ID:5937761 This link opens in a new window
Publication date in RUL:10.07.2015
Views:3846
Downloads:437
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Recalculation of levelling network HE Moste from 1958 to 1986
Abstract:
In the thesis is represented the micro-levelling geodetic network of the Hidroelektrarna Moste (Hydroelectric Power Plant Moste), which is spread along the central barrier in the Kavčke Gorge under Žirovnica. The results of the calculations of geodetic network from 1958 to 1986 were represented. The change of two geometric networks and the used instruments. All the data were reprocessed, the observations were levelled, the results of relative and cumulative movements were logically represented in tabular and graphical form. We provided unified geodetic datum while levelling through the entire period. That provided results us continuous insight into network action throughout the period of 28 years. The showed that in majority there were no bigger movements of benchmarks.

Keywords:graduation thesis, geodesy, TUN, levelling network, geodetic datum, adjustment of indirect observation, benchmark, movements