By constructioning highways on exact ground is often required to make out anchored retaining wall – sleeved piles that protect hillside from sliding. It occur frequently smaller or bigger avalanches and they have to be observed with appropriate geodetic method to perform additional protective arrangements that stabilize hillside. In diploma work are represented particular stages of geodetic project that land surveyor have to consider by these observations. In geodetic project are defined accuracy of observed point displacements, measurement method, geodetic instruments, point disposition on observed structure and landslide, form of geodetic frame and appropriate data representation. The purpose of diploma work is with a geodetic project to acquire a quality information of eventual point displacement on observed structures and landslide.
|