This thesis presents the technological report for the second phase of constructing the sewerage system in the settlement of Raka. The project includes the construction of 2801 meters of sewerage for municipal wastewater, the installation of two pressure pipelines with a total length of 262 meters, the construction of two stormwater channels totaling 271 meters, and the installation of two pumping stations. The primary goal of the project is to improve wastewater management and provide modern municipal infrastructure for the area’s residents.
The thesis focuses on detailed planning of work processes, material selection, site organization, and quality control of the works. It describes individual phases of the project, including preparatory and earthworks, laying sewer pipes, installing manholes and pumping stations, and paving works. The technological procedures for each phase are presented, including the use of appropriate machinery and equipment, and methods to ensure high-quality execution.
|