V magistrski nalogi je obravnavana tematika popolne rekonstrukcije odvodnjavanja padavinskih voda za obstoječe manipulacijske ter strešne površine proizvodnega objekta. V prvem delu magistrske naloge so predstavljene teoretične osnove, na podlagi katerih se projektira ter dimenzionira kanalizacijske sisteme. Med drugim so predstavljeni osnovni kanalizacijski element namenjeni odvodnji padavinskih voda, kot so linijske kanalete, cestni požiralniki, jaški, lovilci olj ter različne vrste kanalizacijskih cevi. V drugem delu magistrske naloge je predstavljen projekt rekonstrukcije odvodnje padavinskih voda iz manipulacijskih in strešnih površin. S programskim paketom Sewer+, ki je plod razvoja slovenskega podjetja SL-King d.o.o. je bila izdelana karta prispevnih površin, ki je služila kot osnova za hidravlični preračunom internega kanalizacijskega omrežja za padavinske vode. Sama odpornost internega kanalizacijskega sistema je bila preizkušena s hidravličnim preračunom z različnimi povratnimi dobami ter dimenzioniranje ponikovalnega polja. V končnem delu je prikazana še stroškovna ocena investicije s projektantskim popisom del.

Language:Slovenian
Keywords:gradbeništvo, magistrsko delo, VOI, kanalizacija, padavinska voda, odvodnja, sewer+
Work type:Master's thesis/paper
Typology:2.09 - Master's Thesis
Organization:FGG - Faculty of Civil and Geodetic Engineering
Place of publishing:Ljubljana
Publisher:[A. Tomažič]
Year:2024
Number of pages:XI, 82 str., 8 f. zganj. pril.
PID:20.500.12556/RUL-158481-8c2cad90-2e37-2fcd-f03b-682ac47c772d This link opens in a new window
UDC:502.131.1:628.315(043.3)
COBISS.SI-ID:199621891 This link opens in a new window
Publication date in RUL:14.06.2024
Views:325
Downloads:65
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Arrangement of the drainage of the handling surfaces of the production facility : master thesis
Abstract:
The subject of the complete reconstruction of rainwater drainage for the existing manipulation and roof surfaces of the production facility is discussed in the master's thesis. In the first part of the master's thesis, the theoretical foundations are presented, on the basis of which sewage systems are designed and dimensioned. Among other things, the presented basic sewerage elements that are intended for the drainage of rainwater, such as linear canals, road drains, manholes, oil separators and various types of sewerage pipes. In the second part of the master's thesis, the reconstruction project of rainwater drainage from manipulation and roof surfaces is presented. With the Sewer+ software package, which is the result of the development of the Slovenian company SL-King d.o.o. a map of the contributing areas was created, which served as the basis for the hydraulic calculation of the internal sewage network for rainwater. The resistance of the internal sewage system itself was tested by hydraulic recalculation with different return periods and dimensioning of the infiltration field. The final part also shows the cost estimate of the investment with a design list of works.

Keywords:civil engineering, master thesis, sewer, stormwater, drainage, sewer+