Postavitev optimiziranega montažnega procesa v podjetju
ID Petek, Lenart (Author), ID Herakovič, Niko (Mentor) More about this mentor... This link opens in a new window, ID Pipan, Miha (Comentor)

.pdfPDF - Presentation file, Download (6,98 MB)
MD5: 397D204237F5C6E8D177152B11E333F9

Abstract
Magistrsko delo obravnava načrtovanje proizvodnega prostora in montažnega procesa za izdelek, razvit v slovenskem podjetju. Najprej smo izdelek razčlenili v podsestave in nato še detajlno na posamezne sestavne dele. S pomočjo strukture izdelka se je določil vrstni red montažnih operacij. Z Work-Factor hitrim postopkom smo izračunali čase posameznih montažnih operacij. V nadaljevanju naloge smo predstavili novo zasnovan tloris, kjer smo upoštevali intenziteto toka materiala in razporeditev montažnih mest ter ostalih potrebnih površin. Podrobno smo opisali glavna montažna mesta in razporeditev zalogovnikov. Pridobljeni rezultati in ugotovitve v nalogi nam služijo za postavitev optimiziranega ročnega montažnega sistema obravnavanega izdelka.

Language:Slovenian
Keywords:struktura izdelka, montažna mesta, montažne operacija, Work-Factor, prijemalo, planiranje tlorisa
Work type:Master's thesis/paper
Typology:2.09 - Master's Thesis
Organization:FS - Faculty of Mechanical Engineering
Place of publishing:Ljubljana
Publisher:[L. Petek]
Year:2024
Number of pages:XX, 75 str.
PID:20.500.12556/RUL-156006 This link opens in a new window
UDC:658.515:621.717(043.2)
COBISS.SI-ID:195260931 This link opens in a new window
Publication date in RUL:27.04.2024
Views:339
Downloads:48
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Design and concept of an optimized assembly process in a company
Abstract:
The master's thesis deals with the design of production space and assembly processes for a product developed in a Slovenian company. Initially, we dissected the product into subassemblies and then further into individual components. Using the product structure, the sequence of assembly operations was determined. Using the quick Work-Factor method, we calculated the times for individual assembly operations. In the continuation of the task, we presented a newly designed layout, taking into account the material flow intensity and the layout of assembly stations and other necessary areas. We provided a detailed description of the main assembly stations and the arrangement of stockpiles. The obtained results and findings in the task serve us in setting up an optimized manual assembly system for the discussed product.

Keywords:product structure, assembly stations, assembly operations, Work-Factor, grapple, planning floor layout