Your browser does not allow JavaScript!
JavaScript is necessary for the proper functioning of this website. Please enable JavaScript or use a modern browser.
Open Science Slovenia
Open Science
DiKUL
slv
|
eng
Search
Browse
New in RUL
About RUL
In numbers
Help
Sign in
Novi Stari Mlin - Idejna zasnova prenove območja Jochmannovega mlina v Ajdovščini
ID
Marc, Meta
(
Author
),
ID
Perović, Vaso
(
Mentor
)
More about this mentor...
PDF - Presentation file,
Download
(130,21 MB)
MD5: 5E47BE744BCB089D49CCC2EA020C1F52
JPG - Appendix,
Download
(7,33 MB)
MD5: FC532CFC1B6FA7F1A40261BA295EA42F
JPG - Appendix,
Download
(9,55 MB)
MD5: 918FD20D45C23F09341064CE370A64FD
This document has even more files. Complete list of files is available
below
.
Image galllery
Abstract
Magistrska naloga “Novi” stari mlin raziskuje možnost povrnitve življenja v več let zapuščeno in propadajočo zgradbo nekoč zelo modernega mlina, v katerem se je razvilo še danes delujoče večje in uspešno podjetje Mlinotest. Naloga izpostavlja problematike mesta Ajdovščine Odpira teme, ki se ob hitri industrializaciji in intenzivem večanju števila prebivalcev, pozabljajo oziroma ne vključujejo v razvoj mesta. Problematike se razdelijo na dva glavna sklopa, ki obravnavata zaprte in odprte prostore mesta ter njihovo programsko namembnost. Projekt prenove območja starega mlina kritično odgovarja na izpostavljene probleme in v mesto vpeljuje inovativne rešitve, ki ga oživljajo, programsko nadgrajujejo hkrati pa sledijo načelom trajnostnega razvoja. Projekt se deli na dva glavna segmenta. V prvi fazi se posvečam arhitekturni prenovi in revitalizaciji stare mlinske stavbe, ki je ena redkih ohranjenih stavb bogate industrijske dediščine mesta. Z radikalnim posegom v mlin se ponovno poudari pomembnost glavne stavbe, katere arhitektura je danes s številnimi prizidki popolnoma degradirana. Z umestitvijo javnega programa se mlin ponovno vrne v uporabo meščanom, hkrati pa se poudari njegov prvotni namen in pomen mlinarstva oziroma prehrambene industrije v Vipavski dolini. V drugi fazi z odgovorom na vprašanje o vzpostavitvi neprekinjene zelene osi ob reki Hubelj obravnavam odprt prostor ob mlinski stavbi, ki s svojo zasnovo poudarja moč reke ter pomembnost zelenega prostora v mestu.
Language:
Slovenian
Keywords:
arhitektura
,
prenova
,
revitalizacija
,
industrijska arhitekturna dediščina
,
Vipavska dolina
,
mlinarstvo
,
Ajdovščina
Work type:
Master's thesis/paper
Organization:
FA - Faculty of Architecture
Year:
2023
PID:
20.500.12556/RUL-152046
COBISS.SI-ID:
171000579
Publication date in RUL:
28.10.2023
Views:
913
Downloads:
759
Metadata:
Cite this work
Plain text
BibTeX
EndNote XML
EndNote/Refer
RIS
ABNT
ACM Ref
AMA
APA
Chicago 17th Author-Date
Harvard
IEEE
ISO 690
MLA
Vancouver
:
Copy citation
Share:
Secondary language
Language:
English
Title:
New Old Mill - Renovation design of the Jochmann's mill area in Ajdovščina
Abstract:
The master’s thesis “New” old mill explores the possibility of restoring the life of an abandoned and dilapidated building of a once very modern mill, where the still-operating company of Mlinotest developed. The project highlights the problems of the town of Ajdovščina. It opens up topics that have been forgotten or those that are not included in the development of the city due to rapid industrialization and rapid increase in the number of inhabitants. The problems are divided into two main sections, which deal with the closed and open spaces of the city and their program purpose. The project of renovation of the old mill’s area critically responds to the identified problems and introduces innovative solutions, which revive the city, programmatically upgrade it, and at the same time follow the principles of sustainable development. The project of the renovation is divided into two main segments. The first phase focuses on the architectural renovation and programmatic revitalization of the old mill building, which is one of the few preserved buildings of the city’s rich industrial heritage. The radical intervention in the mill once again emphasizes the importance of the main building, whose architecture is today completely degraded due to numerous extensions. By installing the public program, the mill is returned to the use of the townspeople, while at the same time its original purpose and the importance of milling or the food industry in the Vipava Valley is emphasized. And the second phase, answering the question of the establishment of a continuous green axis along the river Hubelj, it deals with the open space next to the mill building. With its design, it emphasizes the power of the river and the importance of green space in the city.
Keywords:
architecture
,
renovation
,
revitalization
,
industrial architectural heritage
,
Vipava Valley
,
milling
,
Ajdovščina
Similar documents
Similar works from RUL:
Similar works from other Slovenian collections:
Files
Loading...
Back