izpis_h1_title_alt

Practical implementation of the Mihajlovič method in the “Mantovo” dam
ID Hamza, Veton (Author)

.pdfPDF - Presentation file, Download (1,06 MB)
MD5: F5B58CCDC8B6BF5C602F4199EA4BD00E

Language:English
Keywords:geodetska mreža, deformacije, stabilne točke, epohe meritev, deformacijske analize
Work type:Article
Typology:1.01 - Original Scientific Article
Organization:FGG - Faculty of Civil and Geodetic Engineering
Publication status:Published
Publication version:Author Accepted Manuscript
Year:2017
Number of pages:Str. 50-57
Numbering:Vol. 8
PID:20.500.12556/RUL-151783 This link opens in a new window
UDC:627.8.04:624.04:528.063(497.7)
ISSN on article:1857-9000
COBISS.SI-ID:163057667 This link opens in a new window
Publication date in RUL:20.10.2023
Views:946
Downloads:27
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Record is a part of a journal

Title:Micro, Makro & Mezzo Geo Information. international scientific journal
Publisher:South-East European Research Institute on Geo Sciences "Geo-SEE Institute"
ISSN:1857-9000
COBISS.SI-ID:95239178 This link opens in a new window

Secondary language

Language:Miscellaneous (other)
Abstract:
In complex engineering objects such as dams, bridges, viaducts and other objects, deformations occur on them over time as a result of the external factors and the size of the objects themselves. In order to avoid potential disasters, these objects in certain time periods are supervised for potential deformations. There are a range of different methods of deformation analysis through which displacement of objects is determined. In this research a practical application of the Method of Mihajlovič is applied for determination of horizontal deformations of the “Mantovo” dam with the aim of analyzing the conducted results. In practical implementation two epochs of measurements are used, the first epoch from the year 1978 and the second epoch from the year 2008. From the conducted calculations it is confirmed that this methodology has its disadvantages in determination of the stable points that also affect the determination of the points that are located in the dam itself. This issue is overcome by setting more stable points when developing the network, these points should not be dislocated over time, but of course in natural environments this is difficult to achieve. The inability of determining the stable points is a major drawback that limits the practical implementation of this methodology.

Keywords:geodetic network, deformations, stable points, epochs of measurements, deformation analyses

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back