Your browser does not allow JavaScript!
JavaScript is necessary for the proper functioning of this website. Please enable JavaScript or use a modern browser.
Open Science Slovenia
Open Science
DiKUL
slv
|
eng
Search
Browse
New in RUL
About RUL
In numbers
Help
Sign in
Assessing the Duration of the Lead Appointed Party Coordination Tasks and Evaluating the Appropriate Team Composition on BIM Projects
ID
Mayer, Pavol
(
Author
),
ID
Funtík, Tomáš
(
Author
),
ID
Erdélyi, Ján
(
Author
),
ID
Honti, Richard
(
Author
),
ID
Cerovšek, Tomo
(
Author
)
PDF - Presentation file,
Download
(5,17 MB)
MD5: 2EA8FBB18CCC02C5C6AE5E705F277028
URL - Source URL, Visit
https://www.mdpi.com/2075-5309/11/12/664
Image galllery
Abstract
This paper addresses critical success factors for the delivery of BIM projects. The lack of experience with BIM projects on both the demand and supply side often leads to insufficient project teams, unsatisfied clients, schedule, and cost overruns. In order to better structure and control the information delivery in BIM projects requirements, planning and delivery must be standardized. The latter was achieved by EIR (Exchange Information Requirements), new BIM roles, BEP (BIM Execution Plan), and specified digital handover, which must be supported by a common data environment (CDE). This paper provides an analysis of the characteristics of BIM project delivery and duration in Architectural and Engineering companies in Slovakia. The analysis is based on the web survey of BIM managers and coordinators, which reveals that a significant amount of BIM project efforts must be executed by BIM specialists. The results also graphically depict the scope of critical BIM activities across project phases. The presented study is relevant for various project stakeholders and allows for a deeper understanding of the resources needed for the successful delivery of BIM projects in terms of adequate project team capacity, capability, organization, and planning.
Language:
English
Keywords:
BIM
,
coordination
,
management
,
CDE
,
modeling
,
team
,
collaboration
,
cost
,
estimation
,
project schedule
,
project roles
,
ISO 19650
,
architect
,
appointed party
Work type:
Article
Typology:
1.01 - Original Scientific Article
Organization:
FGG - Faculty of Civil and Geodetic Engineering
Publication status:
Published
Publication version:
Version of Record
Year:
2021
Number of pages:
21 str.
Numbering:
iss. 12, art. 664, Vol. 11
PID:
20.500.12556/RUL-146478
UDC:
004.9:69(497.7)
ISSN on article:
2075-5309
DOI:
10.3390/buildings11120664
COBISS.SI-ID:
111038723
Publication date in RUL:
02.06.2023
Views:
547
Downloads:
119
Metadata:
Cite this work
Plain text
BibTeX
EndNote XML
EndNote/Refer
RIS
ABNT
ACM Ref
AMA
APA
Chicago 17th Author-Date
Harvard
IEEE
ISO 690
MLA
Vancouver
:
Copy citation
Share:
Record is a part of a journal
Title:
Buildings
Shortened title:
Buildings
Publisher:
Molecular Diversity Preservation International
ISSN:
2075-5309
COBISS.SI-ID:
1024478292
Licences
License:
CC BY 4.0, Creative Commons Attribution 4.0 International
Link:
http://creativecommons.org/licenses/by/4.0/
Description:
This is the standard Creative Commons license that gives others maximum freedom to do what they want with the work as long as they credit the author.
Secondary language
Language:
Slovenian
Keywords:
BIM
,
koordinacija
,
upravljanje
,
SPO
,
modeliranje
,
sodelovanje
,
stroški
,
kalkulacije
,
terminskih plani
,
projektne vloge
,
ISO 19650
Similar documents
Similar works from RUL:
Similar works from other Slovenian collections:
Back