izpis_h1_title_alt

Izboljšanje pripravljalnega časa na vrtalnem centru NV
ID Kreže, Nejc (Author), ID Berlec, Tomaž (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (24,06 MB)
MD5: BD374610CD2F9D82B1C269EBDC87DE4C

Abstract
Zaradi hitro spreminjajočih se potreb in razmer na trgu, mora podjetje svoje delovanje usmeriti na čim večjo fleksibilnost in produktivnost proizvodnje, zmanjševanje izgub ter zadovoljitvi končne stranke oz. uporabnika. Vse to je moč doseči z vitkim razmišljanjem in njenimi metodami, med katere sodita tudi SMED in 5S, kateri smo po predpisanih korakih izvedli na izbranem stroju v podjetju. Z metodo SMED smo dosegli skrajšanje časa menjave orodja za 53,3 % prvotnega časa in zmanjšanje potrebne prehojene poti za 73,5 %, medtem ko smo z metodo 5S zagotovili bolj urejeno in čisto delovno mesto, katero pripomore tako k izboljšanju produktivnosti kot tudi povečani varnosti pri opravljanju dela.

Language:Slovenian
Keywords:SMED metoda, metoda 5S, vitka proizvodnja, izboljšava procesov, NV
Work type:Final paper
Typology:2.11 - Undergraduate Thesis
Organization:FS - Faculty of Mechanical Engineering
Place of publishing:Ljubljana
Publisher:[N. Kreže]
Year:2022
Number of pages:XI, 33 f.
PID:20.500.12556/RUL-139357 This link opens in a new window
UDC:658.5:005.935(043.2)
COBISS.SI-ID:121078787 This link opens in a new window
Publication date in RUL:01.09.2022
Views:898
Downloads:279
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Improvement of the preparation time on a drilling centre NV
Abstract:
Due to market demands and situation rapidly changing the company must focus its efforts into higher flexibility and productivity of the production, reducing waste and satisfying the end customer’s needs. All of this can be achieved using the lean way of thinking and its methods such as SMED and 5S, which we conducted using the prescribed steps on a selected machine in the company. SMED method yielded shortening of the changeover by 53,3 % of the original time and shortening of the walking distance when performing the changeover by 73,5 % of the original distance, while the 5S method yielded a more organized and cleaner workplace which contributes not only to increased productivity but also to increased safety.

Keywords:SMED method, 5S method, lean production, process improvement, NV

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back