izpis_h1_title_alt

Feasibility of vertical ecosystem for sustainable water treatment and reuse in touristic resorts
ID Esterlich, Miquel (Avtor), ID Vosse, Josephine (Avtor), ID Comas, Joaquim (Avtor), ID Atanasova, Nataša (Avtor), ID Castellanno Costa, Jordi (Avtor), ID Gattringer, Heinz (Avtor), ID Buttiglieri, Gianluigi (Avtor)

Gradivo nima datotek.
Gradivo je morda fizično dosegljivo v knjižnici fakultete, zalogo lahko preverite v COBISS-u. Povezava se odpre v novem oknu

Jezik:Slovenski jezik
Ključne besede:rastlinska čistilna naprava, horizontalni tok, siva voda, ekonomska upravičenost, cena vode
Tipologija:1.01 - Izvirni znanstveni članek
Organizacija:FGG - Fakulteta za gradbeništvo in geodezijo
Leto izida:2021
Št. strani:[11] str.
Številčenje:Letn. 294/112968, Št. 15. sept.
PID:20.500.12556/RUL-131824 Povezava se odpre v novem oknu
UDK:502/504:628.1
ISSN pri članku:0301-4797
DOI:10.1016/j.jenvman.2021.112968 Povezava se odpre v novem oknu
COBISS.SI-ID:69495811 Povezava se odpre v novem oknu
Datum objave v RUL:04.10.2021
Število ogledov:1306
Število prenosov:0
Metapodatki:XML DC-XML DC-RDF
:
Kopiraj citat
Objavi na:Bookmark and Share

Gradivo je del revije

Naslov:Journal of environmental management
Skrajšan naslov:J. environ. manag.
Založnik:Elsevier
ISSN:0301-4797
COBISS.SI-ID:720405 Povezava se odpre v novem oknu

Sekundarni jezik

Jezik:Angleški jezik
Izvleček:
To counteract increasing water scarcity in the Mediterranean region, this study provides data on the efficiency of a decentralized, nature-based solution for hotel greywater (GW) treatment and reuse. A pilot plant of a constructed wetland called Vertical Ecosystem (vertECO), installed in a large hotel with GW separation, was operated continuously for 12 months. vertECO achieved a removal efficiency higher than 84.0% for COD and TSS and higher than 95.4% for turbidity and BOD5. The monitored physicochemical parameters in the effluent meet the requirements for many reuse purposes restricted in the water reuse legislation. Based on the pilot operation, an economic model was set to estimate its economic feasibility (CAPEX, OPEX and payback period of investment) at several treated volumes. The payback was calculated, at the water and energy prices of Spain and other countries, with a planned operation period of 20 years. The higher the water price, the lower was the payback period. Treated GW volumes of 10.5 and 20 m3/day correspond to payback periods for Spain of 10.1 years and 9.0 years, respectively. Finally, co-benefits of vertECO have been considered alongside economic terms, and compared with another intensive technology (i.e., membrane bioreactor).

Ključne besede:constructed wetland, horizontal flow, greywater, economic feasibility, water price

Podobna dela

Podobna dela v RUL:
Podobna dela v drugih slovenskih zbirkah:

Nazaj