Details

Prenova procesa reševanja in sledenja naročniških zahtev v izbranem podjetju : zaključna strokovna naloga visoke poslovne šole
ID Kajfež, Uroš (Author), ID Grah, Barbara (Mentor) More about this mentor... This link opens in a new window

URLURL - Presentation file, Visit http://www.cek.ef.uni-lj.si/vps_diplome/kajfez1880.pdf This link opens in a new window

Language:Slovenian
Keywords:poslovni proces, spremembe, produktivnost, efektivnost, tehnologija, reševanje problemov, primeri
Work type:Final paper
Typology:2.11 - Undergraduate Thesis
Organization:EF - School of Economics and Business
Place of publishing:Ljubljana
Publisher:[U. Kajfež]
Year:2021
Number of pages:II, 27, 3 str.
PID:20.500.12556/RUL-130683 This link opens in a new window
UDC:658
COBISS.SI-ID:71183619 This link opens in a new window
Publication date in RUL:18.09.2021
Views:1082
Downloads:56
Metadata:XML DC-XML DC-RDF
:
KAJFEŽ, Uroš, 2021, Prenova procesa reševanja in sledenja naročniških zahtev v izbranem podjetju : zaključna strokovna naloga visoke poslovne šole [online]. Bachelor’s thesis. Ljubljana : U. Kajfež. [Accessed 7 April 2025]. Retrieved from: http://www.cek.ef.uni-lj.si/vps_diplome/kajfez1880.pdf
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Transforming the process of resolving and tracking user claims in selected company
Keywords:business process, changes, productivity, efficiency, technology, broblem solving, cases

Similar documents

Similar works from RUL:
  1. Patterns of tree growth in a single tree selection silver fir-European beech forest
  2. Stand structure of an uneven-aged fir-beech forest with an irregular diameter structure
  3. Sliced veneer waviness factors
  4. Beech tree quality in forest management unit Preserje - Rakitna
  5. Rastna dinamika pragozdnega ostanka Rajhenavski Rog v obdobju 1984-2010
Similar works from other Slovenian collections:
  1. Steel bussines building
  2. THREE-STOREY BUSINESS STEEL BUILDING 21 X 35 M
  3. 100 m long steel cable-stayed bridge
  4. STEEL THREE - STOREY BUILDING 20x24x12 m
  5. 55 m long composite bridge

Back