Podrobno

Načrtovanje časovnega poteka obnove poslovne stavbe : magistrsko delo
ID Fajdiga, Bojan (Avtor), ID Šelih, Jana (Mentor) Več o mentorju... Povezava se odpre v novem oknu, ID Srdič, Aleksander (Komentor)

.pdfPDF - Predstavitvena datoteka, prenos (4,89 MB)
MD5: A5CB2A386B0142854F917A37CDC1FF7D
.pdfPDF - Priloga, prenos (19,60 MB)
MD5: F027729356F417FD6F3D573C335F3AF3

Izvleček
Magistrsko delo obravnava načrtovanje in optimizacijo časa za obnovo upravne stavbe AD MEPSO. Lokacija objekta se nahaja v središču mesta Skopje (R. S. Makedonija). Prenova se izvaja z namenom izboljšanja energetske učinkovitosti objekta v skladu z zahtevami iz strategije Evropa 2020. V prvem, teoretičnem delu je prikazana podrobna analiza in primerjava zakonov, ki so relevantni za gradnjo gradbenih objektov v Republiki Sloveniji in Republiki S. Makedoniji. V drugem, praktičnem delu, smo pripravili projekt organizacije obnove stavbe. Podani so popolni tehnični podatki in risbe obstoječega ter novoustanovljenega stanja stavbe. Posebna pozornost je namenjena izbiri in preizkušanju gradbenih materialov, ki bodo uporabljeni za gradnjo. Nadalje smo pripravili časovni načrt poteka izvedbe in razvili ter analizirali dve varianti. Prva varianta je načrtovana tako, da se objekt izvede v dveh fazah, v drugi varianti se prenova objekta naredi v celoti oziroma naenkrat. Po podrobni analizi in primerjavi obeh možnosti je bila izbrana najprimernejša varianta z vidika investitorja, ki smo jo dodatno optimizirali. S tem bistveno skrajšamo skupni čas gradnje, ki je potreben za obnovo obravnavanega objekta.

Jezik:Slovenski jezik
Ključne besede:stavba, optimizacija, terminski plan, obnova, gradbeno dovoljenje, kakovost materiala, aktivnosti, načrtovanje
Vrsta gradiva:Magistrsko delo/naloga
Tipologija:2.09 - Magistrsko delo
Organizacija:FGG - Fakulteta za gradbeništvo in geodezijo
Založnik:[B. Fajdiga]
Leto izida:2020
PID:20.500.12556/RUL-115357 Povezava se odpre v novem oknu
UDK:658.513.4:69.059.25:725(043.3)
COBISS.SI-ID:20362499 Povezava se odpre v novem oknu
Datum objave v RUL:24.04.2020
Število ogledov:3116
Število prenosov:390
Metapodatki:XML DC-XML DC-RDF
:
FAJDIGA, Bojan, 2020, Načrtovanje časovnega poteka obnove poslovne stavbe : magistrsko delo [na spletu]. Magistrsko delo. B. Fajdiga. [Dostopano 2 april 2025]. Pridobljeno s: https://repozitorij.uni-lj.si/IzpisGradiva.php?lang=slv&id=115357
Kopiraj citat
Objavi na:Bookmark and Share

Sekundarni jezik

Jezik:Angleški jezik
Naslov:Planning a time schedule for renovation of an administrative building : master thesis
Izvleček:
The master's thesis deals with the planning and time optimization for reconstruction of the AD MEPSO administrative building. The building is located in the center of Skopje (R.N Macedonia). The reconstruction is carried out in order to improve the energy efficiency of the building in accordance with the requirements of the Europe 2020 strategy. In the second, practical part, we prepared the project for organization of the reconstruction of the building. Complete technical data and drawings of the existing and newly established condition of the building are given. Special attention is paid to the selection and testing of building materials which will be used for the reconstruction of the building. Furthermore, we prepared a timetable for implementation and two options were developed and analyzed. The first option foresees the reconstruction to be done in two phases, while the second option foresees the renovation to be done in full i.e. in one phase. After a detailed analysis and comparison of the two options, the most suitable option was selected from the investor's perspective, which we further optimized. This significantly shortens the total time required for reconstruction of the object.

Ključne besede:building, optimization, time schedule, renovation, building permit, material quality, activities, planning

Podobna dela

Podobna dela v RUL:
  1. Pomen tumorskih matičnih celic in epitelno-mezenhimskega prehoda pri napredovanju nedrobnoceličnega raka pljuč
  2. Gene expression levels of the prolyl hydroxylase domain proteins PHD1 and PHD2 but not PHD3 are decreased in primary tumours and correlate with poor prognosis of patients with surgically resected non-small-cell lung cancer
  3. Proučevanje izražanja gena za fosfatidiletanolamin-N-metiltransferazo v nedrobnoceličnem pljučnem rakavem tkivu
  4. Uporabnost imunohistokemičnega določanja mutacij receptorja za epidermalni rastni faktor pri raku pljuč
  5. Sladkorna bolezen in športna vadba
Podobna dela v drugih slovenskih zbirkah:
  1. Uvedba triažnega testa HPV
  2. Stališča staršev do cepljenja proti humanem papiloma virusu
  3. Odkrivanje raka materničnega vratu s testiranjem za visokorizične humane viruse papiloma
  4. Rak materničnega vratu in program ZORA
  5. Cepljenje proti HPV po konizaciji

Nazaj