izpis_h1_title_alt

Krajšanje časa prevzema procesa ogrevalne svečke s senzorjem tlaka
ID Mavrar, Žiga (Author), ID Berlec, Tomaž (Mentor) More about this mentor... This link opens in a new window, ID Kušar, Janez (Comentor)

.pdfPDF - Presentation file, Download (2,66 MB)
MD5: 537C5A1FFE7617F017376D1FD8117257

Abstract
Ne optimizirana proizvodnja v današnjem hitrem svetu za podjetje ne pomeni nič dobrega, zato vsaka strmi k čim hitrejšem proizvajanju izdelkov in dejavnostim, ki so za to potrebne. V zaključni nalogi se ukvarjamo z optimizacijo prevzema procesa ogrevalne svečke s senzorjem tlaka, ki je potreben za zagotavljanje kakovosti izdelkov, ki so narejeni za tem. V nalogi je na kratko predstavljen postopek, po katerem smo s pomočjo metode hitrih menjav in 5S metode skrajšali čas prevzema procesa ter izboljšali delovni proces, obenem pa smo s tem tudi znatno znižali stroške podjetja.

Language:Slovenian
Keywords:hitra menjava orodja, prevzem procesa, vitka proizvodnja, izboljšave, delovni procesi, 5S metoda
Work type:Final paper
Typology:2.11 - Undergraduate Thesis
Organization:FS - Faculty of Mechanical Engineering
Place of publishing:Ljubljana
Publisher:[Ž. Mavrar]
Year:2019
Number of pages:XIV, 41 f.
PID:20.500.12556/RUL-110511 This link opens in a new window
UDC:658.51:005.935(043.2)
COBISS.SI-ID:16936219 This link opens in a new window
Publication date in RUL:15.09.2019
Views:2490
Downloads:274
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Reducing takeover process time of glow plugs with pressure sensor
Abstract:
Non-optimized manifacturing in today's fast paced world doesn't do any good fort he company, so everyone is striving to produce products and activities that come together with that as quickly as possible. In the final thesis, we are dealing with optimizing the takeover process of glow plugss with pressure sensor which is required to ensure the quality of the products that are made afterwards. Thesis briefly outlines usage of SMED and 5S method. With those two methods we shorten the takeover process time and improved the workflow, while also reducing the company's costs by a large margin.

Keywords:single minute die exchange, takeover processes, lean manifacturing, improving workflow, 5S method

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back