izpis_h1_title_alt

Izdelava reber na orodnem vložku s pomočjo potopne elektroerozije
ID Hozjan, Tai (Author), ID Valentinčič, Joško (Mentor) More about this mentor... This link opens in a new window, ID Lebar, Andrej (Comentor)

.pdfPDF - Presentation file, Download (2,43 MB)
MD5: 5B2C106580254EA4FEFFAC1B04E68E51

Abstract
Zaključna naloga prikazuje izdelavo oblikovnih reber na veliki seriji orodnih vložkov za zaporke in sicer s potopno elektroerozijo. Osrednji problem predstavlja majhna hitrost odnašanja materiala, ki je posledica fizikalnega principa procesa potopne elektroerozije. Z ustrezno vpenjalno pripravo za hkratno obdelavo več orodnih gnezd (vložkov), je mogoče doseči večje hitrosti odnašanja materiala pri grobi obdelavi. V delu so predstavljeni ukrepi, ki pripomorejo k skrajšanju časa priprave za obdelavo, obdelave in hkrati zelo zmanjšajo možnosti za nastanek napak. Ugotovili smo, da z uporabo vpenjalne priprave za več vložkov hkrati, ne le skrajšamo časa izdelave serije, ampak tudi zelo olajšamo delo operaterjem na več oddelkih orodjarne.

Language:Slovenian
Keywords:elektroerozijska obdelava, potopna elektroerozija, orodje, injekcijsko brizganje, vpenjalne priprave, vložki, zaporke
Work type:Final paper
Typology:2.11 - Undergraduate Thesis
Organization:FS - Faculty of Mechanical Engineering
Place of publishing:Ljubljana
Publisher:[T. Hozjan]
Year:2019
Number of pages:XIV, 36 f.
PID:20.500.12556/RUL-109833 This link opens in a new window
UDC:621.9.048:658.5(043.2)
COBISS.SI-ID:16925211 This link opens in a new window
Publication date in RUL:09.09.2019
Views:1794
Downloads:294
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Manufacturing of ribs on tool insert using die-shining EDM
Abstract:
The final assignment shows the manufacturing of ribs on a large series of tool inserts for caps using die-sinking EDM. The central problem is the low rate of material removal, which is a consequence of the physical principle of the die-sinking EDM process. With a suitable clamping device for simultaneous machining of several tool inserts, it is possible to achieve faster material removal rates during rough machining. This seminar paper introduces measures that help to shorten process preparation times, processing, while greatly reducing the chances of occurring errors. We have found that by using a clamping device for several inserts at the same time, we not only shorten the production time of the batch, but also make it very easy for operators to work in several other departments of the toolshop.

Keywords:electrical discharge machining, die-sinking EDM, injection molding tools, clamping templates, inserts, closures

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back