Preureditev potniške kabine letala Airbus A320
ID Taleska, Dani (Author), ID Kosel, Tadej (Mentor) More about this mentor... This link opens in a new window, ID Berlec, Tomaž (Co-mentor)

.pdfPDF - Presentation file, Download (4,45 MB)
MD5: 738371DA81717F96C6D9B9D99E03335C

Abstract
Na željo nizkocenovne letalske družbe je bila v podjetju za vzdrževanje letal izvedena modifikacija serije 16 letal s preureditvijo potniške kabine. Glavni doprinos naloge je optimizacija delovnega procesa modifikacije. Prvotno je bilo načrtovanih 21 delovnih dni za eno letalo, oziroma 336 dni za celotno serijo letal. Z optimizacijo izvedbe v dveh korakih smo uspeli skrajšati čas izvedbe na 12 dni za letalo in s tem modificirati celotno serijo letal v 209 dneh. V prvem koraku optimizacije smo uvedli postopek s predhodno pripravo podsklopov strukturalnega dela modifikacije in s tem skrajšali čas prizemljitve vsakega letala za 7 dni. Drugi korak optimizacije je zajemal zasnovo in izdelavo obdelovalnih šablon, s čimer smo skrajšali čas prizemljitve še za 2 dodatna dneva. Optimiziran proces izdelave omogoča hitrejšo vrnitev letala v uporabo, kar predstavlja pozitiven ekonomičen doprinos za letalskega prevoznika in za vzdrževalno organizacijo.

Language:Slovenian
Keywords:letalo A320 modifikacija strukture strukturalni nosilci Spaceflex povečanje števila sedežev
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FS - Faculty of Mechanical Engineering
Place of publishing:Ljubljana
Publisher:[D. Taleska]
Year:2019
Number of pages:XXII, 49 str.
PID:20.500.12556/RUL-107683 This link opens in a new window
UDC:629.7.024.5(043.2)
COBISS.SI-ID:16632347 This link opens in a new window
Publication date in RUL:12.05.2019
Views:1100
Downloads:397
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Rearrange the passenger fuselage of the Airbus 320
Abstract:
Based on request of a low cost airline, modification with cabin reconfiguration of 16 aircraft was performed in maintenance organisation. The main contribution was optimisation of modification process. Initially, 21 working days were predicted for each aircraft or 336 days for whole series. With process optimisation in two steps we managed to reduce groundtime to 12 days per aircraft or 209 days for the whole series. In first optimisation step, prefabrication of components was implemented and with this groundime was reduced by 7 days per aircraft. Second optimisation step includes design and manufacturing of templates, which reduced total groundtime of each aircraft by additional 2 days. With use of optimised process aircraft can be returned to revenue service sooner, which presents positive economical contribution to the airline and the maintenance center.

Keywords:aircraft A320 structural modification structural beam Spaceflex increase of passenger capacity