izpis_h1_title_alt

Prenova sistema planiranja in vodenja proizvodnje po naročilu
ID Jordan Kozjak, Žiga (Author), ID Kušar, Janez (Mentor) More about this mentor... This link opens in a new window, ID Butala, Peter (Comentor)

.pdfPDF - Presentation file, Download (4,22 MB)
MD5: D8EB103186001928EF669811DE22434A
.pdfPDF - Appendix, Download (282,75 KB)
MD5: E054A9B54094B35CAC791B8C958F3A9C
.pdfPDF - Appendix, Download (299,17 KB)
MD5: D6F68E2A02FF0CC383D8C45DC7F3D6FB

Abstract
V magistrskem delu je prikazana analiza obstoječega sistema planiranja proizvodnje v podjetju, ki se ukvarja s proizvodnjo hidromehanske opreme. Vsako naročilo se na strateškem nivoju planiranja obravnava kot projekt, na operativnem nivoju pa se planiranje izvede po principu načrtovanja materialnih potreb in spremljanja proizvodnje s pomočjo informacijskega sistema za spremljanje proizvodnje. Analiza obstoječega stanja je pokazala vrsto pomanjkljivosti predvsem pri zajemanju realnih podatkov o poteku proizvodnje in njihovemu vplivu na strateški nivo planiranja. Prenovljeni sistem planiranja in vodenja proizvodnje temelji na sodobnih metodologijah projektnega vodenja naročil in pri tem upošteva smernice Industrije 4.0. Rešitve so oblikovane tako, da jih bo mogoče implementirati le s prilagoditvami obstoječega poslovnega informacijskega sistema podjetja.

Language:Slovenian
Keywords:reinženiring poslovnega procesa, projektno vodena proizvodnja, planiranje proizvodnje, krmiljenje proizvodnje, ERP sistem, MES sistem, Industrija 4.0
Work type:Master's thesis/paper
Organization:FS - Faculty of Mechanical Engineering
Year:2018
PID:20.500.12556/RUL-105919 This link opens in a new window
Publication date in RUL:23.12.2018
Views:2583
Downloads:570
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Project planning and control system reengineering in engineering to order company
Abstract:
In the master's thesis the analysis of the existing production planning system, which is used in the company for production of hydro energetic equipment, is presented. Each order is treated as a project on the strategic level of planning. On the operative level, planning is performed according to the principle of material requirement system and control of the production using manufacturing execution system. The analysis has of the existing condition has shown a lot of downsides, especially when collecting the input data regarding the production progress. Accuracy of collected data have a significant impact on strategic level of planning. The reengineered system of production planning and control is based on modern methodologies of project managed orders. Its concept is based on the paradigm called Industry 4.0. Solutions are created in such way that they can be implemented by reorganising the existing business process information system of the company.

Keywords:business process reengineering, engineering-to-order production, production planning, production control, ERP system, MES system, Industry 4.0

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back