izpis_h1_title_alt

Planiranje gradnje v okolju BIM : diplomska naloga
ID Gortnar, Jernej (Author), ID Turk, Žiga (Mentor) More about this mentor... This link opens in a new window, ID Klinc, Robert (Comentor)

.pdfPDF - Presentation file, Download (2,33 MB)
MD5: 8F67D1637A00ACB91D1E1F44B3B4F277

Abstract
V diplomski nalogi opisujemo računalniška orodja za planiranje gradnje v okolju BIM. Izbrali in pregledali smo tri programe: Navisworks Manage, Bexel Manager in Synchro Pro. Naloga opisuje nadgradnjo 3D BIM-modela v 4D in primerjavo razlik v postopku nadgradnje. V nalogi ovrednotimo programsko opremo glede na kriterije dostopnosti in 4D-sposobnosti. Podana je ugotovitev o razdelanosti BIM-modela, ki je potrebna za 4D-plan in kasneje za spremljanje gradnje. Govori tudi, ali je smiselno BIM 4D-model izdelati med fazo projektiranja. Na koncu ugotovimo, da je najbolj primerno orodje za planiranje gradnje Bexel Manager, da je razdelanost modela LOD 300 dovolj za spremljanje gradnje in da izdelava 4D BIM-modela ni potrebna v fazi projektiranja.

Language:Slovenian
Keywords:BIM 4D-model, Navisworks Manage, Bexel Manager, Synchro Pro, terminski plan, nadgradnja 3D-modela
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FGG - Faculty of Civil and Geodetic Engineering
Publisher:[J. Gortnar]
Year:2018
PID:20.500.12556/RUL-103337 This link opens in a new window
UDC:004:699.86(043.2)
COBISS.SI-ID:8534881 This link opens in a new window
Publication date in RUL:16.09.2018
Views:2506
Downloads:639
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Construction planning in BIM environment : graduation thesis
Abstract:
In the thesis we review software for construction planning in BIM design environment. We reviewed three programs: Navisworks Manage, Bexel Manager and Synchro Pro. The thesis describes experiences with the upgrade of a 3D BIM-model to 4D and compares differences in the upgrade processes. The thesis also evaluates the software on the criteria of availability of the program and of its 4D-capabilities. It estimates the level of development of a BIM-model, which is needed to 4D-plan and later monitor the construction on-site. It discusses if it is worthwhile to create BIM 4D-model in phase of design. It was found out that the most suitable software for construction planning is Bexel Manager; that LOD 300 is enough to monitor the construction and that the making a 4D BIM-model is not needed in the design phase.

Keywords:BIM 4D-model, Navisworks Manage, Bexel Manager, Synchro Pro, project plan, upgrade of 3D-model

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back