Diplomsko delo obravnava analizo delovanja obstoječega sistema za čiščenje zaprtih sistemov ter analizo in preračun grelnega elementa kot del nadgradnje sistema. V prvem delu so za lažje razumevanje predstavljene teoretične osnove naprave, možnosti in funkcije, ki jih lahko opravljamo z napravo, delovanje in izbira prave centrifugalne črpalke ter način uporabe v proizvodnji v procesu pridelave piva. V drugem delu je opisan postopek priprave merilne proge, predstavitev uporabljene merilne opreme in izvedba meritev obstoječega sistema v pivovarni. V zadnjem delu so opisani in prikazani rezultati meritev. V sklopu zadnjega dela je še narejen tudi preračun in prikaz poteka temperatur, v primeru vgradnje grelnega elementa v sistem pranja. Opisane so rešitve in predlogi, s katerimi bi povečali učinkovitost ter zmanjšali stroške pri procesu pranja.

Jezik:Slovenski jezik
Ključne besede:naprava za čiščenje zaprtih sistemov povezave cevovodov črpalke postopek pranja merilna proga merilna oprema rezultati meritev grelni element
Vrsta gradiva:Diplomsko delo/naloga
Tipologija:2.11 - Diplomsko delo
Organizacija:FS - Fakulteta za strojništvo
Založnik:[M. Sirk]
Leto izida:2018
PID:20.500.12556/RUL-102462 Povezava se odpre v novem oknu
UDK:628.29:621.797(043.2)
COBISS.SI-ID:16252187 Povezava se odpre v novem oknu
Datum objave v RUL:31.08.2018
Število ogledov:1366
Število prenosov:233
Metapodatki:XML RDF-CHPDL DC-XML DC-RDF
:
Kopiraj citat
Objavi na:Bookmark and Share

Sekundarni jezik

Jezik:Angleški jezik
Naslov:Design and recalculation of the tubing heaters for upgrading the CIP (cleaning in place) station
Izvleček:
The diploma thesis deals with the analysis of the functioning existing system for cleaning closed systems, and in the second part, the analysis and calculation of the heating element, as a part of the system upgrade. In the first part are for easier understanding presented theoretical basis of the device, the possibilities and functions of which can be performed with the device, operation and selection of the right centrifugal pump and the way of use in production in the process of beer production. The second part describes the process of preparing the measuring track, the presentation of the used measuring equipment and the execution of measurements of the existing system in the brewery. In the last section are displayed and described the results of the measurements. Within the last part there are also calculations made and a display of the flow of temperatures is carried out, in case of the installation of the heating element in the washing system. Solutions and suggestions are described in order to increase efficiency and reduce costs in the washing process.

Ključne besede:CIP - clean in place pipeline connections pumps cleaning process measuring scheme measuring equipment results of the measurements heating element