izpis_h1_title_alt

Zasnova nadgradnje montažne in lepilne postaje
ID Bajt, Rok (Author), ID Vrabič, Rok (Mentor) More about this mentor... This link opens in a new window, ID Butala, Peter (Comentor)

.pdfPDF - Presentation file, Download (4,74 MB)
MD5: E449B71789FDDDDFFE205EDDF626A197

Abstract
V diplomski nalogi je zasnovana nadgradnja montažne in lepilne postaje. V prvem delu diplomske naloge so opisani industrijski roboti. Sledi opis podjetja Stäubli in predstavitev njihovih robotov. V nadaljevanju je predstavljena celotna proizvodnja linija za izdelavo rotorjev elektromotorjev ter montažna in lepilna postaja. Narejena je študija izvedljivosti te postaje. Vsak del nadgradnje je podrobno opisan skupaj s pripadajočimi takti. Sledi simulacija postaje z dodatnim robotom in opis programov za izvajanje simulacije. V rezultatih je predstavljen nov takt postaje in preračun donosnosti investicije.

Language:Slovenian
Keywords:industrijski robot, simulacija, montažna in lepilna postaja, nadgradnja, ozko grlo, ROI
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FS - Faculty of Mechanical Engineering
Place of publishing:Ljubljana
Publisher:[R. Bajt]
Year:2018
Number of pages:XXIV, 54 str.
PID:20.500.12556/RUL-101563 This link opens in a new window
UDC: 004.942:007.52:519.876.5(043.2)
COBISS.SI-ID:16104219 This link opens in a new window
Publication date in RUL:16.06.2018
Views:1664
Downloads:464
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Design of an improved assembly and gluing station
Abstract:
In the thesis, an upgrade of a rotor assembly and glueing station that uses an industrial robot is presented. Industrial robots and robot manufacturer Stäubli are introduced. The current rotor line, assembly, and glueing stations are described. A feasibility study of upgrading the existing station is made, focusing on several improvements and associated cycle times. Introduction of an additional robot into the station is studied through simulation. The results show an improvement in total cycle time and present the calculation of the return of investment.

Keywords:industrial robot, simulation, assembly and gluing station, upgrade, bottleneck, ROI

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back