<?xml version="1.0"?>
<rdf:RDF xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:dc="http://purl.org/dc/elements/1.1/"><rdf:Description rdf:about="https://repozitorij.uni-lj.si/IzpisGradiva.php?id=162788"><dc:title>IFC-based schedule optimization</dc:title><dc:creator>Njuguna,	Melody Wanjiku	(Avtor)
	</dc:creator><dc:creator>Cerovšek,	Tomo	(Mentor)
	</dc:creator><dc:creator>Parente,	Manuel	(Komentor)
	</dc:creator><dc:subject>master thesis</dc:subject><dc:subject>civil engineering</dc:subject><dc:subject>evolutionary algorithms</dc:subject><dc:subject>genetic algorithms</dc:subject><dc:subject>optimization</dc:subject><dc:description>A construction or demolition scheduling problem with resource allocation has both the challenge of
sequencing the correct order of works to the elements being constructed or demolished, and assigning
the correct labour teams to do this work. Solving this problem requires the knowledge of a wide array
of factors, from sequence to coordination of trades, to safety and skill. Even though scheduling and
resource allocation problems have been studied at length in the past century, the current existence of
modern technologies, i.e. Building Information Modelling and Evolutionary Algorithms, promises the
potential to create new ways of solving these problems.
This study explores literature on the confluence of these two technologies in the specific context of
schedule optimization, and then proposes a method of performing schedule and resource optimization
for construction and demolition, based on IFC models and their elements' GUIDs. With the use of a
precedence matrix and a chromosome repair strategy, an evolutionary algorithm, NSGA-II is used to
generate multiple results bearing optimal schedule orders, and construction and deconstruction costs and
times. The methodology is then tested on two case studies, where its efficacy is proven on a demolition
problem and a simplified construction problem.
The findings of the study show the potential for use of the proposed schedule optimization system within
construction and demolition, and proposals are made on methods and strategies to build upon and extend
this work.</dc:description><dc:publisher>[M. W. Njuguna]</dc:publisher><dc:date>2024</dc:date><dc:date>2024-09-27 08:46:28</dc:date><dc:type>Magistrsko delo/naloga</dc:type><dc:identifier>162788</dc:identifier><dc:language>sl</dc:language></rdf:Description></rdf:RDF>
