Analiza poteka gradnje prizidka poslovno-skladiščnega objekta Uprom
ID
Mandelj, Miha
(
Avtor
),
ID
Šelih, Jana
(
Mentor
)
Več o mentorju...
,
ID
Srdič, Aleksander
(
Komentor
)
PDF - Predstavitvena datoteka,
prenos
(6,44 MB)
MD5: 438EB6797E0315F3E56F185D3BA1CDF5
PID:
20.500.12556/rul/6018b66f-f7fd-4f04-bb2c-feaad6c22f9a
Galerija slik
Izvleček
Diplomsko delo analizira stroškovni in časovni potek gradnje poslovno-skladiščnega objekta. Izvedli smo primerjavo na podlagi pogodbenih in dejanskih cen materiala in dela. Na koncu je narejena primerjava med cenami in opisani razlogi, kjer le-ti odstopajo. Pri časovni analizi izgradnje objekta, od začetka gradnje do gradbenega zaprtja objekta (vsa gradbena dela in obrtna, streha in fasada), smo primerjali terminski plan z dejansko izvedbo del po zapisih v gradbenem dnevniku. Na koncu časovne analize so navedena odstopanja, rešitve izvajalca in mogoče rešitve za doseganje pogodbenih planov.
Jezik:
Slovenski jezik
Ključne besede:
gradbena pogodba
,
terminski plan
,
kalkulacija
Vrsta gradiva:
Diplomsko delo/naloga
Organizacija:
FGG - Fakulteta za gradbeništvo in geodezijo
Leto izida:
2017
PID:
20.500.12556/RUL-97636
Datum objave v RUL:
31.10.2017
Število ogledov:
2033
Število prenosov:
786
Metapodatki:
Citiraj gradivo
Navadno besedilo
BibTeX
EndNote XML
EndNote/Refer
RIS
ABNT
ACM Ref
AMA
APA
Chicago 17th Author-Date
Harvard
IEEE
ISO 690
MLA
Vancouver
:
MANDELJ, Miha, 2017,
Analiza poteka gradnje prizidka poslovno-skladiščnega objekta Uprom
[na spletu]. Diplomsko delo. [Dostopano 13 april 2025]. Pridobljeno s: https://repozitorij.uni-lj.si/IzpisGradiva.php?lang=slv&id=97636
Kopiraj citat
Objavi na:
Sekundarni jezik
Jezik:
Angleški jezik
Naslov:
Analysis of the progress of construction of an extension of the business-warehouse facility Uprom
Izvleček:
The diploma thesis analyzes the cost and time course of the construction of a business-warehouse facility. In diploma thesis a comparison was made, based on contractual and actual prices of materials and labor. At the end of the diploma thesis comparison is made between the prices and described reasons for price deviation, where they differ. In the time analysis of the construction of the building, from the beginning of the construction to the completion of the building (all construction works and craft, roof and facade), we compared the construction timetable with the actual execution of works according to the records in the building log. At the end of the time analysis, there are mentioned price deviations, solutions of the contractor and possible solutions for achieving contractual plans.
Ključne besede:
construction contract
,
term plan
,
calculation
Podobna dela
Podobna dela v RUL:
Usposobljenost razrednih učiteljev za poučevanje učencev z disleksijo
Zdravje razrednih učiteljev v osrednji Sloveniji
Zdravje razrednih učiteljev Obalno-kraške regije
Uvajanje otrok priseljencev v razred v Sloveniji in Angliji
Vokalna tehnika in glasovna higiena pri bodočih učiteljih razrednega pouka
Podobna dela v drugih slovenskih zbirkah:
Priprava ponudbenega predračuna za rekonstrukcijo zgornjega ustroja Ulice kneza Koclja v Mariboru
Popis del s predizmerami in ponudbeni predračun za dozidavo in rekonstrukcijo stanovanjske hiše
Vodenje projekta skozi ms project v v podjetju rls merilna tehnika d.o.o.
Osnovni principi stroškovne optimizacije terminskih planov gradbenih projektov
Tehnološki, ekonomski in terminski vidiki sanacije objekta
Nazaj