This final thesis discusses the measurements of the levelling networks of Hydroelectric Power Plant Formin and Markovec Dam in October 2016. In the first part of the thesis, we start by briefly presenting the Hydroelectric Power Plant Formin and Markovec Dam, and continue by describing the levelling network and the theory of geometric levelling. In the second part, we discuss the calculations of geometric levelling, the evaluations of the accuracy of the measurements and the network adjustment, followed by the assessment of the accuracy of the vertical movements and the analysis of the movements in terms of statistical characteristics. The results of the evaluations of the movements are graphically compared to the measurements conducted in July and October 2015 and June 2016.
|