The master's thesis deals with the design of production space and assembly processes for a product developed in a Slovenian company. Initially, we dissected the product into subassemblies and then further into individual components. Using the product structure, the sequence of assembly operations was determined. Using the quick Work-Factor method, we calculated the times for individual assembly operations. In the continuation of the task, we presented a newly designed layout, taking into account the material flow intensity and the layout of assembly stations and other necessary areas. We provided a detailed description of the main assembly stations and the arrangement of stockpiles. The obtained results and findings in the task serve us in setting up an optimized manual assembly system for the discussed product.
|